Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

Annexe 4 - Status Report on Transformational and Major Crown Projects


RADARSAT-2

The RADARSAT-2 Major Crown Project (MCP) activities ended during the 2010-2011 fiscal year. The Major Crown Project closure submission received Treasury Board approval in May 2010.

Summary of Non-Recurring Expenditures ($ in millions)
(as of March 31, 2010)
Program Current Estimated Total Expenditure Forecast to March 31, 2010 Planned Spending 2010-2011 Future Years
RADARSAT–2 417.7 417.7 0.0 0.0





RADARSAT Constellation

1- Description

The RADARSAT Constellation is the follow-on to RADARSAT-1 and RADARSAT-2. RADARSAT-1 was launched in 1995 and is still operating. RADARSAT-2, developed in partnership with the private sector, was launched in 2007 for a seven-year mission. Canada has established itself as a leading global supplier of C-band satellite radar data. The RADARSAT Constellation will enhance this leadership and position Canadian industry in technology and value-added product markets.

The RADARSAT Constellation is designed as a scalable constellation of three small satellites. The first satellite is planned to be launched during fiscal year 2014-2015, followed by the second and third in fiscal year 2015-2016. With a constellation, the time between successive imaging of the same part of the Earth (revisit time) is significantly reduced. The creation of a three-satellite constellation will increase the frequency of available information, as well as the reliability of the system, making it better suited to operational requirements of Departments. In the event of a satellite failure, the other satellites will be able to provide a reduced level of service.

The scope of the RADARSAT Constellation Major Crown Project (MCP) includes the design, development, manufacture, integration, test and launch of the satellites plus the design, development, manufacture and installation of the associated ground segment. One year of operation of the three-satellite constellation is also included in addition to an applications development program.

The RADARSAT Constellation will provide all-weather day and night data in support of three key priorities: maritime surveillance, environment and resources monitoring, and disaster management. The three-satellite constellation will provide more accurate data than its predecessors with an average daily coverage of Canada and its surrounding waters. Coverage will increase significantly in Canada's North.

The RADARSAT Constellation supports the maritime surveillance requirements of Environment Canada, the Department of National Defence, Fisheries and Oceans Canada (including the Canadian Coast Guard) and Transport Canada. It is the principal data source envisioned for wide area surveillance of Canada's remote areas and sea lanes. Only satellite data can offer regular cost-effective coverage to task ships and aircraft seeking to intercept suspect vessels. The daily coverage of marine areas will also support fisheries monitoring, ice and iceberg monitoring, pollution monitoring and integrated ocean and coastal zone management.

The RADARSAT Constellation will support monitoring on Natural Resources Canada, Environment Canada, Parks Canada and Agriculture and Agri-Food Canada. It will be a critical source of information for agriculture, forestry and wildlife habitat. The Constellation will also provide medium resolution data for wide area change detection, supporting water quantity monitoring, wetlands mapping and coastal change monitoring.

The RADARSAT Constellation can provide high resolution (3m), all-weather imagery of most places in the world on a daily basis for the purpose of supporting disaster management, both in Canada and globally. This data is critical to disaster mitigation, warning, response and recovery. Disaster types supported include flood monitoring and relief, oil spills, changes in the permafrost in northern Canada, volcanic eruption and earthquake warning and hurricane monitoring.

In addition, the RADARSAT Constellation develops Canadian high technology design and manufacturing capabilities and the integration of satellite data into information products and services. Canada's space and geomatics industries will benefit from favourable positioning on international markets and increased access to data essential to many international users.

The RADARSAT Constellation will provide C-band SAR data continuity for existing RADARSAT users, including the Canadian Ice Service. The Service relies on SAR data to fulfill its mandate to provide the most accurate and timely information about ice in Canada's navigable waters to promote safe and efficient maritime operations and to help protect Canada's environment.


2- Project Phase

RADARSAT Constellation MCP completed the preliminary design in March 2010.


3- Leading and Participating Departments and Agencies

Sponsoring Agency: Canadian Space Agency
Contracting Authority: Public Works and Government Services Canada
Participating Departments: Natural Resources Canada
Environment Canada
National Defence
Foreign Affairs and International Trade
Industry Canada
Fisheries and Oceans
Agriculture and Agri-Food Canada
Transport Canada
Public Safety
Indian and Northern Affairs Canada
Parks Canada


4- Prime and Major Sub-Contractors

Prime Contractor City
- MacDonald, Dettwiler and Associates (MDA) - Richmond, British Columbia


Major Sub-Contractors City
- MacDonald, Dettwiler and Associates - Ste.-Anne-de-Bellevue, Quebec
- Magellan Aerospace, Bristol Aerospace - Winnipeg, Manitoba
- COMDEV Limited - Cambridge, Ontario
- MacDonald, Dettwiler and Associates - Halifax, Nova Scotia


5- Major Milestones

The major milestones on the RADARSAT Constellation Major Crown Project are the following:

Phase Major Milestones End Date
A: Initial Planning and Identification Requirement Definition March 2009
B: Preliminary Design Preliminary Design March 2010
C: Detailed Design Detailed Design July 2012
D: Manufacture and Acceptance Launch satellite #1
Launch satellite #2 and # 3
2014-2015
2015-2016
E1: Operations Operations (part of MCP) March 2017
E2: Operations Operations (not part of MCP) 2017 to 2024

6- Project Outcomes

RADARSAT Constellation is managed under the Space Data, Information and Services Program Activity and will contribute to a single overarching result:

User Other Government Departments (OGDs) offer more diversified or cost-effective programs and services due to their utilization of space-based solutions. This result is measured by:

  1. Number of OGDs' programs serviced by space data/services that are outlined in reports to Parliament (RPP, DPR) of such users.

  2. Degree of appreciation expressed by the OGDs through formal and informal structures.

Performance is monitored in the CSA Departmental Performance Report. For more performance information, go to:
http://www.asc-csa.gc.ca/eng/publications/default.asp#parliament


7- Progress Report and Explanation of Variances

On December 13, 2004, the Domestic Affairs Committee of Cabinet granted approval-in-principle to a ten-year, $600 million program to implement a RADARSAT Constellation aimed at addressing user needs with respect to Canadian sovereignty and marine surveillance, environmental monitoring and change detection, and disaster management. The RADARSAT Constellation is to be government-owned and operated.

In the 2005 Budget, the CSA was provided with an additional $110.9 million over five years (2005-2006 to 2009-2010). Combined with a further $89.1 million from the CSA's reference levels, a total of $200 million was identified for CSA to work with the Canadian space industry on the development of the next generation of advanced radar remote sensing satellites. This funding covers Phases A (Initial Planning and Identification Phase) through C (Detailed Design Phase) of the RADARSAT Constellation Project, but is insufficient for building and operating the satellites.

On June 6, 2005, Treasury Board (TB) granted Preliminary Project Approval (PPA) to the RADARSAT Constellation and expenditure authority for the Project Initial Planning and Identification Phase A at a substantive cost estimate of $13 million (excluding GST). Phase A sought to finalize feasibility studies, define user requirements, payload and bus options for the mission, and reduce technology risks for the antenna, transmit/receive modules, and sensor electronics.

The Phase A work started in July 2005 and was completed in December 2006. Phase A was then extended to allow additional technical risk reduction activities to continue during the period prior to the Phase B contract award. This was completed in March 2008.

A revised PPA TB Submission to proceed to Phases B and C was approved in March 2007. In December 2006, Public Works and Government Services Canada (PWGSC) initiated a competitive Request for Proposal (RFP) process to identify a prime contractor for the RADARSAT Constellation project (i.e., for Phases B/C/D of the space segment and a portion of the ground segment) and negotiate a contract for Phases B and C with the winning prime contractor, MDA. The contract for Phase D would follow successful completion of Phases B and C, obtaining the necessary funding and the granting of Effective Project Approval (EPA) from TB. In September 2008, PWGSC obtained authority to enter into a contract with MDA. Negotiations for Phase B were completed in October 2008 and the contract for Phase B was awarded to MDA in November 2008. Phase B was completed in March 2010. The contract for Phase B was amended to include the scope of Phase C which will continue until January 2012. Budget 2010 approved continuation of the RCM program by allocating $497 million over 5 years, $100 million of which will come from CSA's Reference Levels.

A joint Revised Preliminary Project Approval (PPA) was prepared by CSA and PWGSC, and was approved by Treasury Board (TB) on December 9, 2010. The RCM Major Crown Project indicative cost estimates were revised from $625 million to $873 million. The purpose of this Revised PPA was also to request Revised Expenditure Authority for RCM to include the procurement of long-lead items during Phase C and also the inclusion of a technology demonstration program for the DND funded Automatic Identification System (AIS) payload. As a result of the addition of the long-lead items, the phase C is now planned to end in July 2012, although the mission CDR will occur in January 2012.


8- Industrial Benefits

Significant industrial benefits in the space and Earth observation sectors are expected from the RADARSAT Constellation program. It is expected to generate employment growth in the Canadian knowledge-based economy and spur the growth of small and medium-sized businesses as the Canadian infrastructure and services industry continues to grow. As of March 2010, the CSA had funded $52 million worth of work to Canadian industry directly attributable to the RADARSAT Constellation MCP.

CSA's overall regional distribution targets will apply to the project on a "best efforts" basis. The prime contract also includes a requirement for 70% Canadian content, excluding launch services. Since Canadian space program spending is relatively low in Atlantic Canada, a minimum requirement of 3.5% of the total Canadian content will apply for that region. The prime contract includes reporting obligations and performance measures as well as financial penalties for not meeting the minimum Atlantic Canada content. CSA will continue to work closely with Industry Canada and Atlantic Canada Opportunities Agency to monitor regional distribution achievements and to support the prime contractor in the delivery of the given targets.


Regional Distribution of Canadian Content Contracts to Canadian Industry
(as of March 31, 2010)
Program British Columbia Prairie Provinces Ontario Quebec Atlantic provinces Total Canada
RADARSAT Constellation 30.3% 11.7% 20.1% 34.7% 3.2% 100%
Note:
Due to rounding, decimals may not add up to totals shown.
Summary of Non-Recurring Expenditures ($ in millions)
(as of March 31, 2010)
Program Current Estimated Total Expenditure Forecast to March 31, 2010 Planned Spending 2011-2012 Future Years
RADARSAT Constellation 280.9 118.0 88.5 74.3




James Webb Space Telescope

1- Description

The James Webb Space Telescope (JWST) is a joint mission of NASA, ESA, and the Canadian Space Agency. The mission concept is for a large filled-aperture telescope located 1.5 million km from Earth. Like Hubble, the JWST will be used by the astronomy community to observe targets that range from objects within our Solar System to the most remote galaxies, which are seen during their formation in the early universe. The science mission is centred on the quest to understand our origins, and specifically aimed at:

  • Observing the very first generation of stars to illuminate the dark universe when it was less than a billion years old.
  • Understanding the physical processes that have controlled the evolution of galaxies over cosmic time, and, in particular, identifying the processes that led to the assembly of galaxies within the first 4 billion years after the Big Bang.
  • Understanding the physical processes that control the formation and early evolution of stars in our own and other nearby galaxies.
  • Studying the formation and early evolution of proto-planetary disks, and characterizing the atmospheres of isolated planetary mass objects.

The JWST is scheduled for launch in 2014. JWST instruments will be designed to work primarily in the infrared range of the electromagnetic spectrum, with some capability in the visible range. JWST will have a large mirror, 6.5 metres in diameter and a sunshield the size of a tennis court that will both fold up and open once in outer space.

Canada is providing the Fine Guidance Sensor (FGS) and Tuneable Filter Imager (TFI). The FGS is integral to the attitude control system of JWST, and consists of two fully redundant cameras that will report precise pointing information of JWST. Canadian expertise in this area has been established with the successful fine error sensors for the FUSE mission. Packaged with the FGS but functionally independent, the Tuneable Filter Imager is a unique, narrow-band camera with imaging capability. For example, it will allow astronomers to search for extrasolar planets through a technique called coronography, which means that the light from a star will be blocked out so that astronomers can see what is in the star's neighbourhood.

The JWST-FGS Major Crown Project, in partnership with COM DEV, consists of the design, development, integration and testing and integration into the spacecraft, launch and commissioning of the Fine Guidance Sensor and Tunable Filter Imager.

By participating in this leading-edge international space exploration mission, the Canadian Space Agency is actively promoting Canadian scientific expertise and innovative, advanced space technologies. The National Research Council's Herzberg Institute of Astrophysics is a key Government of Canada partner for activities related to the development of science instruments and distribution of telescope data. In return for its overall investment in the JWST, Canada will obtain a minimum of 5% of the time on this unique space telescope. Already, the news of Canada's involvement in this international space exploration mission is inspiring youth, educators and amateur astronomers, and rallying members of Canada's world-renowned astrophysics community.


2- Project Phase

The JWST-FGS Major Crown Project (MCP) is currently in phase D Integration and Testing.


3- Leading and Participating Departments and Agencies

Sponsoring Agency: Canadian Space Agency
Contracting Authority: Public Works and Government Services Canada for the Canadian Space Agency
Participating Departments: NRC's Herzberg Institute of Astrophysics
Industry Canada


4- Prime and Major Sub-Contractors

Prime Contractor City
- COMDEV Canada - Ottawa, Ontario


Major Sub-Contractors Country
- Teledyne - U.S
- Corning Netoptix - U.S
- IMP Aerospace Avionics - Canada
- ABB Bomem - Canada
- MDA - Canada
- INO - Canada
- CDA - U.S
- ESTL - Europe


5- Major Milestones

The major milestones of the JWST Major Crown Project are the following:

Phase Major Milestones Date
A: Initial Planning and Identification Requirement Definition 2003-2004
B: Preliminary Design Preliminary Design August 2004 to May 2005
C: Detailed Design Detailed Design July 2005 to September 2008
D: Manufacture and Acceptance Manufacturing/Assembly; Integration/Testing; Pre-launch preparations, Launch/System Commissioning May 2007 to December 2015
E: Operations Operations 2014-2015 to 2018-2019
Note:
The Major Crown Project terminates with the completion of Phase D.

6- Project Outcomes

The JWST-FGS MCP is managed under the Space Exploration Program Activity and will contribute to two overarching results:

Result 1 - Expansion of advanced scientific knowledge acquired through space exploration endeavours.

Indicator: Number of peer-reviewed scientific publications, reports and conference proceedings based on space exploration data produced by researches (sciences and technologies) in Canada.

Result 2 - Multiple use and applications of knowledge and know-how acquired through space exploration endeavours.

Indicator: Number of terrestrial applications and of space re-utilization of knowledge and know-how acquired through space exploration endeavours.

Performance is monitored in the CSA Departmental Performance Report. For more performance information, go to:
http://www.asc-csa.gc.ca/eng/publications/default.asp#parliament


7- Progress Report and Explanation of Variances

In March 2004, Treasury Board gave Preliminary Project Approval for Phases B, C and D at an indicative cost of $67.2 million. In December 2006, before the completion of the detailed design of the FGS, the CSA requested increased expenditure authority to complete the project. Treasury Board granted Effective Project Approval for a substantive total cost estimate of $98.4 million in February 2007 with the condition "that the Canadian Space Agency provide reports to Treasury Board at the completion of Phases C and D of the JWST project which include up-to-date information on the project scope, costs, schedule and risks". At the same time, the project became a Major Crown Project.

The first Critical Design Review (CDR), held in March 2007, for the guider function of the FGS, did reveal some technical issues, which required additional effort to resolve. This Review took place after the Effective Project Approval (EPA) received in February 2007. After this first CDR, with the focus now turning toward the preparation of the system level CDR, new issues became apparent requiring additional analysis. Testing of the Tunable Filter Imager prototype also revealed technical issues that needed to be addressed.

During this transition between the completion of the detailed design phase (Phase C) and the initiation of the manufacturing phase (Phase D) the project faced the prospect of a significant cost growth and therefore required the CSA to return to Treasury Board to amend its Effective Project Approval (EPA) for the JWST Major Crown Project. The current estimated total cost for the Definition and Implementation phases is now $147.5 million. In December 2007, Treasury Board granted a revised Effective Project Approval. Manufacturing, integration and test of the FGS will be completed during fiscal year 2010-2011.

During the last period, the project has been very busy with the hardware and software development. COM DEV Canada, the prime contractor for the JWST Fine Guider Sensor (FGS) project, has been working on the FGS Engineering Test Unit (ETU) and Proto Flight Model (PFM).

The ETU was delivered to NASA Goddard Space Flight Center in September 2010 after the successful test campaign replicating the environmental conditions of launch, transition to its operation site and perations. These tests were performed at DFL from the fall of 2009 to the beginning of fiscal year 2010-2011.

On the PFM side, COM DEV International Ltd. has received the flight components and proceeded with the integration steps. The PFM is planned to be delivered to NASA Goddard Space Flight Center in 2011.


8- Industrial Benefits

As of March 31, 2010, the CSA has funded $71.97 million worth of work to Canadian industry directly attributable to the JWST-FGS Major Crown Project. Direct industrial benefits from the construction of the JWST-FGS and TFI system will benefit central regions of Canada. Although there is no regional distribution requirement for this project, the following table provides an approximate distribution:

Regional Distribution of Canadian Content Contracts to Canadian Industry
(as of March 31, 2010)
Program Ontario Quebec Atlantic Provinces Total Canada
JWST-FGS and TFI 89.5% 8.7% 1.8% 100%

Summary of Non-Recurring Expenditures ($ in millions)
(Forecast to March 31, 2011)
Program Current Estimated Total Expenditure Forecast to March 31, 2011 Planned Spending 2011-2012 Future Years
JWST-FGS and TFI 147.5 141.2 4.5 1.8