Site 00003130 - NICOLA RIVER NEAR SPENCES BRIDGE
-
Status
Confirmatory sampling completed. No further action required. -
Site Status
Closed -
Classification
Low Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Federal activities -
Property Type
Non-Federal (Provincial Government)
Site Location
-
Latitude, Longitude
50.32972, -121.22556 -
Municipality
Thompson-Nicola I (Blue Sky Country), BC -
Federal Electoral District
Mission--Matsqui--Fraser Canyon
Site Management Strategy
- Assessment
Contaminant Details
Contamination Estimate
-
Cubic Meters
13 -
Tons
22
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Surface water |
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Sediment |
PHCs (petroleum hydrocarbons) | Soil |
PHCs (petroleum hydrocarbons) | Other medium |
PAHs (polycyclic aromatic hydrocarbon) | Surface water |
PAHs (polycyclic aromatic hydrocarbon) | Groundwater |
PAHs (polycyclic aromatic hydrocarbon) | Sediment |
PAHs (polycyclic aromatic hydrocarbon) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Other medium |
Action Plan
The hydrometric network uses different methods to measure water levels. One method involves the use of wells constructed with creosote treated wood. As scientific understanding of creosote evolved it was discovered that sources treated with these chemicals may adversely affect the environment. In order to correctly assess its liability at each site, WSC plans to investigate hydrometric stations that used wood treated with these chemicals.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 0 |
5 km | 39 |
10 km | 97 |
25 km | 1,020 |
50 km | 16,227 |
Summary of Annually Reported Data
Total Expenditures
-
Remediation
$35,805.90
FCSAP Expenditures
-
Remediation
$30,435.00
Financial/Annual Information
2023-2024click to collapse contents
2023-2024
Reporting Organization
Environment and Climate Change CanadaInternal Identifier
00003130Highest Step Completed
09 Confirmatory Sampling and Final ReportingTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$35,805.90Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$30,435.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
6.32 tClosed
Yes
- Version:
- 42