Site 00003242 - DUNCAN RIVER BELOW B.B. CREEK

  • Status

    Classification completed. Remedial action plan under development.
  • Site Status

    Active
  • Classification

    Medium Priority for Action

Site Details

Site Location

Locate this site on map
  • Latitude, Longitude

    50.63806, -117.04722
  • Municipality

    Central Kootenay D, BC
  • Federal Electoral District

    Kootenay--Columbia

Site Management Strategy

  • Assessment

Contaminant Details

Contamination Estimate

  • Cubic Meters

    13
  • Tons

    22

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Surface water
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Sediment
PHCs (petroleum hydrocarbons) Soil
PHCs (petroleum hydrocarbons) Other medium
PAHs (polycyclic aromatic hydrocarbon) Surface water
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Sediment
PAHs (polycyclic aromatic hydrocarbon) Soil
PAHs (polycyclic aromatic hydrocarbon) Other medium

Action Plan

The hydrometric network uses different methods to measure water levels. One method involves the use of wells constructed with creosote treated wood. As scientific understanding of creosote evolved it was discovered that sources treated with these chemicals may adversely affect the environment. In order to correctly assess its liability at each site, WSC plans to investigate hydrometric stations that used wood treated with these chemicals.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km0
5 km7
10 km31
25 km224
50 km1,469

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    Environment and Climate Change Canada
  • Internal Identifier

    00003242
  • Highest Step Completed

    06 Classify the site using the CCME National Classification System
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2022-2023click to expand contents 

2012-2013click to expand contents 

2011-2012click to expand contents 

 

loading