Site 00022206 - Port Simpson
-
Status
Long term monitoring completed. No further action required. -
Site Status
Closed -
Classification
Not a Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
A reserve as defined in the Indian Act -
Property Type
Canada Lands
Site Location
-
Latitude, Longitude
54.55744, -130.43414 -
Municipality
Lax Kw'alaams 1, BC -
Federal Electoral District
Skeena--Bulkley Valley
Site Management Strategy
- Remediation
Contaminant Details
Contamination Estimate
-
Cubic Meters
1
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Soil |
Action Plan
In 2004, petroleum hydrocarbon contamination was identified in the nursing station crawlspace as a result of a diesel fuel spill of unknown quantity from two aboveground storage tanks. An environmental site assessment undertaken in February 2007 estimated that contamination was limited to the area of the concrete crawlspace and the furnace room. Fuel was leaking from pipes and joints in the crawlspace. An additional environmental site assessment was undertaken to confirm the extent of contamination. It confirmed the results and remediation was completed in the concrete crawlspace and furnace room and consisted of the removal of absorbent materials used to contain the spilled fuel. The fuel tanks and the associated piping that were leaking has been removed. No further diesel fuel remains on site at Health Canada's facilities. Site remediated.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 4 |
5 km | 117 |
10 km | 351 |
25 km | 876 |
50 km | 17,667 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$44,000.00 -
Remediation
$30,300.00
FCSAP Expenditures
-
Assessment
$44,000.00
Financial/Annual Information
2008-2009click to collapse contents
2008-2009
Reporting Organization
Health CanadaInternal Identifier
674-PS-02Highest Step Completed
10 Long-Term Monitoring (Optional)Total Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
Yes
- Version: