Site 00024914 - Shearwater CC-144B Challenger Crash Site (Site 249)
-
Status
Classification completed. Remedial action plan under development. -
Site Status
Active -
Classification
Low Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Federal Real Property -
Property Type
Federal (DFRP Property Number 02863)
Site Location
-
Latitude, Longitude
44.640341, -63.494142 -
Municipality
Halifax, NS -
Federal Electoral District
Dartmouth--Cole Harbour
Site Management Strategy
- Additional assessment
Contaminant Details
Contamination Estimate
-
Hectares
3
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Surface water |
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Sediment |
PHCs (petroleum hydrocarbons) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Surface water |
PAHs (polycyclic aromatic hydrocarbon) | Groundwater |
PAHs (polycyclic aromatic hydrocarbon) | Sediment |
PAHs (polycyclic aromatic hydrocarbon) | Soil |
Metal, metalloid, and organometallic | Surface water |
Metal, metalloid, and organometallic | Groundwater |
Metal, metalloid, and organometallic | Sediment |
Metal, metalloid, and organometallic | Soil |
Other organics | Surface water |
Other organics | Groundwater |
Other organics | Sediment |
Other organics | Soil |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Surface water |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Groundwater |
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 1,242 |
5 km | 56,855 |
10 km | 217,383 |
25 km | 435,289 |
50 km | 527,253 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$158,155.96
FCSAP Expenditures
-
Assessment
$95,862.22
Financial/Annual Information
2023-2024click to collapse contents
2023-2024
Reporting Organization
National DefenceInternal Identifier
0361-C055Highest Step Completed
06 Classify the site using the CCME National Classification SystemTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
- Version:
- 42