Site 00024948 - Kapyong Site

  • Status

    Confirmatory sampling completed. No further action required.
  • Site Status

    Closed
  • Classification

Site Details

  • Reporting Organization

  • Reason for Involvement

    Federal activities
  • Property Type

    Non-Federal (Non-Agent Crown Corporation)

Site Location

Locate this site on map
  • Latitude, Longitude

    49.851661, -97.211389
  • Municipality

    Winnipeg, MB
  • Federal Electoral District

    Winnipeg South Centre

Site Management Strategy

  • Remediation

Contaminant Details

Contamination Estimate

  • Tons

    302

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Soil
BTEXs (benzene, toluene, ethylbenzene, and xylene) Groundwater
BTEXs (benzene, toluene, ethylbenzene, and xylene) Soil
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Soil
Metal, metalloid, and organometallic Groundwater
Metal, metalloid, and organometallic Soil
Halogenated Hydrocarbon Groundwater
Halogenated Hydrocarbon Soil
Energetics Soil
Other inorganics Groundwater
Other inorganics Soil
Other organics Groundwater
Other organics Soil

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km5,634
5 km123,812
10 km471,562
25 km755,906
50 km849,497

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $252,020.96

FCSAP Expenditures

  • Assessment

    $183,899.28

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    National Defence
  • Internal Identifier

    0456-C013
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2022-2023click to expand contents 

2021-2022click to expand contents 

2020-2021click to expand contents 

2019-2020click to expand contents 

2018-2019click to expand contents 

2017-2018click to expand contents 

2016-2017click to expand contents 

 

loading