Site 00025115 - 5 CDSB Gagetown PFAS Site-Wide

  • Status

    Historical review planned.
  • Site Status

    Suspected
  • Classification

Site Details

  • Reporting Organization

  • Reason for Involvement

    Federal Real Property
  • Property Type

    Federal (DFRP Property Number 04089)

Site Location

Locate this site on map
  • Latitude, Longitude

    45.651041, -66.336765
  • Municipality

    Petersville, NB
  • Federal Electoral District

    New Brunswick Southwest

Site Management Strategy

  • Periodic Monitoring
  • Assessment

Contaminant Details

Contamination Estimate

The following contaminated media may exist on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Soil
PAHs (polycyclic aromatic hydrocarbon) Surface water
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PFAS (per and poly fluoroalkyl substances) Groundwater
PFAS (per and poly fluoroalkyl substances) Soil
Other inorganics Surface water
Other inorganics Groundwater
Other inorganics Sediment

Additional Information

The term "Site-Wide PFAS" (or similar) is a naming convention used by DND to indicate that all areas of potential environmental concern (APECs) related to PFAS at a DND property are being assessed together to maximize project efficiency and effectiveness. Usage of this term does not indicate that PFAS is present throughout the entire property.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km3
5 km98
10 km546
25 km20,127
50 km232,968

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $194,807.51

FCSAP Expenditures

  • Assessment

    $153,846.01

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    National Defence
  • Internal Identifier

    0159-C132
  • Highest Step Completed

    01 Identify Suspect Sites
  • Total Assessment Expenditure

    $192,307.51
  • Total Remediation Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $153,846.01
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No