Site 00025115 - 5 CDSB Gagetown PFAS Site-Wide
-
Status
Historical review planned. -
Site Status
Suspected -
Classification
Site Details
-
Reporting Organization
-
Reason for Involvement
Federal Real Property -
Property Type
Federal (DFRP Property Number 04089)
Site Location
-
Latitude, Longitude
45.651041, -66.336765 -
Municipality
Petersville, NB -
Federal Electoral District
New Brunswick Southwest
Site Management Strategy
- Periodic Monitoring
- Assessment
Contaminant Details
Contamination Estimate
The following contaminated media may exist on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Surface water |
PAHs (polycyclic aromatic hydrocarbon) | Groundwater |
PFAS (per and poly fluoroalkyl substances) | Groundwater |
PFAS (per and poly fluoroalkyl substances) | Soil |
Other inorganics | Surface water |
Other inorganics | Groundwater |
Other inorganics | Sediment |
Additional Information
The term "Site-Wide PFAS" (or similar) is a naming convention used by DND to indicate that all areas of potential environmental concern (APECs) related to PFAS at a DND property are being assessed together to maximize project efficiency and effectiveness. Usage of this term does not indicate that PFAS is present throughout the entire property.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 3 |
5 km | 98 |
10 km | 546 |
25 km | 20,127 |
50 km | 232,968 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$194,807.51
FCSAP Expenditures
-
Assessment
$153,846.01
Financial/Annual Information
2023-2024click to collapse contents
2023-2024
Reporting Organization
National DefenceInternal Identifier
0159-C132Highest Step Completed
01 Identify Suspect SitesTotal Assessment Expenditure
$192,307.51Total Remediation Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$153,846.01FCSAP Remediation Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed