Site 00026433 - Pukaskwa National Park Borrow Pit

  • Status

    Classification completed. Remedial action plan under development.
  • Site Status

    Active
  • Classification

    Medium Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    National Park of Canada
  • Property Type

    Canada Lands

Site Location

Locate this site on map
  • Latitude, Longitude

    48.291445, -86.134458
  • Municipality

    Thunder Bay, Unorganized, ON
  • Federal Electoral District

    Algoma--Manitoulin--Kapuskasing

Site Management Strategy

  • Assessment

Contaminant Details

Contamination Estimate

  • Cubic Meters

    4,487

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Surface water
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Surface soil
PHCs (petroleum hydrocarbons) Soil
BTEXs (benzene, toluene, ethylbenzene, and xylene) Surface water
BTEXs (benzene, toluene, ethylbenzene, and xylene) Groundwater
BTEXs (benzene, toluene, ethylbenzene, and xylene) Surface soil
BTEXs (benzene, toluene, ethylbenzene, and xylene) Soil
Metal, metalloid, and organometallic Soil

Action Plan

The site is under assessment steps.

Additional Information

The site is located in a national park of Canada

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km0
5 km0
10 km0
25 km0
50 km1,998

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $198,256.84
  • Remediation

    $78,300.61

FCSAP Expenditures

  • Assessment

    $163,069.59
  • Remediation

    $65,376.61

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    Parks Canada Agency
  • Internal Identifier

    AEPPUKT004
  • Highest Step Completed

    06 Classify the site using the CCME National Classification System
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $78,300.61
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $65,376.61
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2022-2023click to expand contents 

2021-2022click to expand contents 

2020-2021click to expand contents 

2019-2020click to expand contents 

2018-2019click to expand contents 

2017-2018click to expand contents 

2016-2017click to expand contents 

2015-2016click to expand contents 

 

loading