Site 02267011 - CFS Barrington
-
Status
Confirmatory sampling completed. Long term monitoring underway. -
Site Status
Active -
Classification
Low Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Federal Real Property -
Property Type
Federal (DFRP Property Number 02267)
Site Location
-
Latitude, Longitude
43.45185, -65.47034 -
Municipality
Barrington, NS -
Federal Electoral District
South Shore--St. Margarets
Site Management Strategy
- Periodic Monitoring
Contaminant Details
Contamination Estimate
-
Tons
7,200
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Surface water |
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Sediment |
PHCs (petroleum hydrocarbons) | Soil |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Groundwater |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Soil |
Metal, metalloid, and organometallic | Surface water |
Metal, metalloid, and organometallic | Groundwater |
Metal, metalloid, and organometallic | Soil |
PCBs (Polychlorinated Biphenyl) and PCDD/Fs (polychlorinated dibenzo-p-dioxin/dibenzofuran) | Soil |
PFAS (per and poly fluoroalkyl substances) | Groundwater |
PFAS (per and poly fluoroalkyl substances) | Soil |
Other organics | Soil |
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) | Groundwater |
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 32 |
5 km | 808 |
10 km | 2,619 |
25 km | 10,629 |
50 km | 27,504 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$60,431.28 -
Remediation
$505.80
FCSAP Expenditures
-
Assessment
$60,431.28
Financial/Annual Information
2023-2024click to collapse contents
2023-2024
Reporting Organization
National DefenceInternal Identifier
0050-C002Highest Step Completed
09 Confirmatory Sampling and Final ReportingTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
No
- Version:
- 42