Site 02860001 - Hartlen Point (5543) - Former Boiler House

  • Status

    Detailed testing completed. No further action required.
  • Site Status

    Closed
  • Classification

    Medium Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    Federal Real Property
  • Property Type

    Federal (DFRP Property Number 02860)

Site Location

Locate this site on map
  • Latitude, Longitude

    44.5966, -63.4543
  • Municipality

    Halifax, NS
  • Federal Electoral District

    Sackville--Preston--Chezzetcook

Site Management Strategy

  • Risk Management

Contaminant Details

Contamination Estimate

  • Cubic Meters

    975

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Soil
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Soil
Metal, metalloid, and organometallic Surface water
Metal, metalloid, and organometallic Groundwater
Metal, metalloid, and organometallic Soil
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Surface water
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Groundwater

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km1,081
5 km18,220
10 km74,490
25 km389,383
50 km521,177

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $215,702.52
  • Remediation

    $84,005.28

FCSAP Expenditures

  • Assessment

    $165,642.89
  • Remediation

    $18,119.07

Financial/Annual Information

2017-2018click to collapse contents 

2017-2018

  • Reporting Organization

    National Defence
  • Internal Identifier

    0185-C001
  • Highest Step Completed

    07 Develop Remediation/Risk Management Strategy
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $18,119.07
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $18,119.07
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2016-2017click to expand contents 

2015-2016click to expand contents 

2014-2015click to expand contents 

2013-2014click to expand contents 

2012-2013click to expand contents 

2011-2012click to expand contents 

2010-2011click to expand contents 

2009-2010click to expand contents 

2008-2009click to expand contents 

2007-2008click to expand contents 

2006-2007click to expand contents 

2005-2006click to expand contents 

 

loading