Site 02863017 - Shearwater (217) - Engine Run Up Area (DIPM Site)

  • Status

    Confirmatory sampling completed. No further action required.
  • Site Status

    Closed
  • Classification

    Medium Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    Federal Real Property
  • Property Type

    Federal (DFRP Property Number 02863)

Site Location

Locate this site on map
  • Latitude, Longitude

    44.6353, -63.5017
  • Municipality

    Halifax, NS
  • Federal Electoral District

    Dartmouth--Cole Harbour

Site Management Strategy

  • Additional assessment
  • Risk Management

Contaminant Details

Contamination Estimate

  • Cubic Meters

    10

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Surface water
PHCs (petroleum hydrocarbons) Sediment
PHCs (petroleum hydrocarbons) Surface soil
PHCs (petroleum hydrocarbons) Soil
PAHs (polycyclic aromatic hydrocarbon) Surface water
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Sediment
PAHs (polycyclic aromatic hydrocarbon) Surface soil
PAHs (polycyclic aromatic hydrocarbon) Soil
Metal, metalloid, and organometallic Surface water
Metal, metalloid, and organometallic Groundwater
Metal, metalloid, and organometallic Sediment
Metal, metalloid, and organometallic Surface soil
Metal, metalloid, and organometallic Soil
Other inorganics Surface water
Other inorganics Groundwater

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km424
5 km55,949
10 km230,325
25 km435,891
50 km526,954

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $190,903.96
  • Remediation

    $46,981.12

FCSAP Expenditures

  • Assessment

    $102,684.90

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    National Defence
  • Internal Identifier

    0361-C018
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $71.68
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2022-2023click to expand contents 

2021-2022click to expand contents 

2020-2021click to expand contents 

2019-2020click to expand contents 

2018-2019click to expand contents 

2017-2018click to expand contents 

2016-2017click to expand contents 

2015-2016click to expand contents 

2014-2015click to expand contents 

2013-2014click to expand contents 

2001-2002click to expand contents 

 

loading