Site 09144001 - Vacant land (Building demolished)
-
Status
Long term monitoring completed. No further action required. -
Site Status
Closed -
Classification
Low Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Contractual obligation -
Property Type
Non-Federal (Private Sector)
Site Location
-
Latitude, Longitude
45.02474, -75.657853 -
Municipality
North Grenville, ON -
Federal Electoral District
Leeds--Grenville--Thousand Islands and Rideau Lakes
Site Management Strategy
- Other
Contaminant Details
Contamination Estimate
-
Cubic Meters
75
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Soil |
Action Plan
Soil excavation and off-site disposal completed. Groundwater monitoring completed. No further action required.
Additional Information
Overfilling of fuel oil underground storage tank in 1985 resulted in soil contamination. Two underground storage tanks were removed in 1993. Residual contamination remained. Then soil was excavated and disposed off-site. Groundwater monitoring until fiscal year 06/07. Decommissioned 3 monitoring wells in 2006/07. Fiscal year 07/08 sample monitoring well - 2 and if results are within guidelines will provide disclosure report and decommission well. Suspected decrease in detected petroleum hydrocarbons (PHC) concentration for monitoring well - 2. Water sampling of monitoring well -2 continue for fiscal year 07/08. During 07/08 the building was demolished. No further action required.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 809 |
5 km | 8,754 |
10 km | 15,204 |
25 km | 67,028 |
50 km | 1,215,735 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$13,900.00
Financial/Annual Information
2009-2010click to collapse contents
2009-2010
Reporting Organization
Public Services and Procurement CanadaInternal Identifier
Ontario 09144001Highest Step Completed
10 Long-Term Monitoring (Optional)Total Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
Yes