Site 09401020 - Alaska Highway - Sikanni Maintenance Camp

  • Status

    Remedial action plan completed. Remediation / risk management underway.
  • Site Status

    Active
  • Classification

    High Priority for Action

Site Details

Site Location

Locate this site on map
  • Latitude, Longitude

    57.233918, -122.691799
  • Municipality

    Peace River B, BC
  • Federal Electoral District

    Prince George--Peace River--Northern Rockies

Site Management Strategy

  • Periodic Monitoring

Contaminant Details

Contamination Estimate

  • Cubic Meters

    192,500

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Soil
BTEXs (benzene, toluene, ethylbenzene, and xylene) Groundwater
BTEXs (benzene, toluene, ethylbenzene, and xylene) Soil
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Soil
Metal, metalloid, and organometallic Groundwater
Metal, metalloid, and organometallic Soil
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Groundwater
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Soil

Action Plan

Remedial technology selected is excavation with on-site treatment via conventional biocell.

Additional Information

Near district lot 541, regional lands file 0268471, map reserve no. 66083. The Former Sikanni Maintenance Camp is located approximately 1.8 kilometres to the north along the Alaska Highway, on the eastern side of the highway.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km0
5 km5
10 km21
25 km111
50 km373

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $86,668.00
  • Remediation

    $10,671,124.84

FCSAP Expenditures

  • Remediation

    $9,168,784.21

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    Public Services and Procurement Canada
  • Internal Identifier

    Pacific 09401020
  • Highest Step Completed

    07 Develop Remediation/Risk Management Strategy
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $1,678,373.70
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $1,426,668.54
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2022-2023click to expand contents 

2021-2022click to expand contents 

2020-2021click to expand contents 

2019-2020click to expand contents 

2018-2019click to expand contents 

2017-2018click to expand contents 

2016-2017click to expand contents 

2015-2016click to expand contents 

2014-2015click to expand contents 

2013-2014click to expand contents 

2012-2013click to expand contents 

2011-2012click to expand contents 

2010-2011click to expand contents 

2009-2010click to expand contents 

2008-2009click to expand contents 

2007-2008click to expand contents 

2006-2007click to expand contents 

2005-2006click to expand contents 

 

loading