Site 09401300 - Alaska Highway - Former Construction Camp S-18/S-19
-
Status
Remedial action plan completed. Remediation / risk management underway. -
Site Status
Active -
Classification
High Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Contractual obligation -
Property Type
Non-Federal (Provincial Government)
Site Location
-
Latitude, Longitude
58.660916, -123.95019 -
Municipality
Northern Rockies, BC -
Federal Electoral District
Prince George--Peace River--Northern Rockies
Contaminant Details
Contamination Estimate
-
Cubic Meters
4,000
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Surface soil |
PHCs (petroleum hydrocarbons) | Soil |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Groundwater |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Surface soil |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Soil |
PAHs (polycyclic aromatic hydrocarbon) | Groundwater |
PAHs (polycyclic aromatic hydrocarbon) | Surface soil |
PAHs (polycyclic aromatic hydrocarbon) | Soil |
Metal, metalloid, and organometallic | Groundwater |
Metal, metalloid, and organometallic | Surface soil |
Metal, metalloid, and organometallic | Soil |
Action Plan
Site is being addressed through risk assessment and risk management measures.
Additional Information
Site is being addressed through risk assessment and risk management measures.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 0 |
5 km | 0 |
10 km | 0 |
25 km | 0 |
50 km | 0 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$40,370.00 -
Remediation
$321,842.91
FCSAP Expenditures
-
Assessment
$40,370.00 -
Remediation
$321,842.91
Financial/Annual Information
2023-2024click to collapse contents
2023-2024
Reporting Organization
Public Services and Procurement CanadaInternal Identifier
Pacific 09401300Highest Step Completed
07 Develop Remediation/Risk Management StrategyTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed