Site 20190016 - Beaver Creek RCMP Detachment Site
-
Status
Confirmatory sampling completed. No further action required. -
Site Status
Closed -
Classification
High Priority for Action
Site Details
-
Reporting Organization
-
Reason for Involvement
Federal Real Property -
Property Type
Federal (DFRP Property Number 20190)
Site Location
-
Latitude, Longitude
62.38522, -140.87215 -
Municipality
Beaver Creek, YT -
Federal Electoral District
Yukon
Site Management Strategy
- Periodic Monitoring
- Risk Management
Contaminant Details
Contamination Estimate
-
Cubic Meters
50
The following contaminated media was identified on the site:
Contaminant Type | Medium Type |
---|---|
PHCs (petroleum hydrocarbons) | Groundwater |
PHCs (petroleum hydrocarbons) | Surface soil |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Groundwater |
BTEXs (benzene, toluene, ethylbenzene, and xylene) | Surface soil |
PAHs (polycyclic aromatic hydrocarbon) | Groundwater |
Action Plan
One historic sample showed a light extractable petroleum hydrocarbons (LEPH) concentration equal to the Yukon Territorial Government Contaminated Sites Regulation for Aquatic Life. Additional detailed site investigation and risk assessment have been completed and risk levels are acceptable. No further work required.
Population
This table contains the population estimates at distances around the site.
Radius | Population |
---|---|
1 km | 10 |
5 km | 92 |
10 km | 92 |
25 km | 92 |
50 km | 92 |
Summary of Annually Reported Data
Total Expenditures
-
Assessment
$421,878.90 -
Remediation
$266,578.24
FCSAP Expenditures
-
Assessment
$391,687.90 -
Remediation
$251,040.51
Financial/Annual Information
2013-2014click to collapse contents
2013-2014
Reporting Organization
Royal Canadian Mounted PoliceInternal Identifier
PR M/19Highest Step Completed
09 Confirmatory Sampling and Final ReportingTotal Assessment Expenditure
$0.00Total Remediation Expenditure
$36,526.00Total Care Maintenance Expenditure
$0.00Total Monitoring Expenditure
$0.00FCSAP Assessment Expenditure
$0.00FCSAP Remediation Expenditure
$31,047.10FCSAP Care Maintenance Expenditure
$0.00FCSAP Monitoring Expenditure
$0.00Actual Cubic Meters Remediated
0 m3Actual Hectares Remediated
0 haActual Tons Remediated
0 tClosed
Yes
- Version:
- 42