Site 29864001 - Farnsworth Lake Float Plane Base

  • Status

    Remediation / risk management completed. Confirmatory sampling underway.
  • Site Status

    Active
  • Classification

    Medium Priority for Action

Site Details

Site Location

Locate this site on map
  • Latitude, Longitude

    58.754549, -94.105785
  • Municipality

    Churchill, MB
  • Federal Electoral District

    Churchill--Keewatinook Aski

Site Management Strategy

  • Remediation

Contaminant Details

Contamination Estimate

  • Cubic Meters

    1,065

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Groundwater
BTEXs (benzene, toluene, ethylbenzene, and xylene) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Groundwater

Action Plan

In situ air sparging remedial system has been designed and tested for the site. System was installed in Spring 2009, but the site was not fully remediated by the end of the season. Reinstall system in 2010 and continue running the system until remediation is complete. Reinstall system in 2011 and continue running the system until remediation is complete. In 2012, documentation & sample results from 1995-2012 were reviewed & groundwater wells were sampled. Groundwater monitoring conducted 2012-2013 & 2013-2014. NCSCS classification in 2012-2013 indicated INS - Insufficient Information. 2013-2014 attempt to delineate extent of impacted soil and groundwater awaiting draft report and recommendations for further work, including whether or not to include re-installing air sparging system. No work conducted in 2014- 2015. The action plan, at a minimum, is to continue monitoring. 2015-2016 A supplimental Phase 3 ESA and groundwater monitoring program conducted to attempt closure of impacted soil plume, impacted sediment plume, and impacted groundwater. A remedial options evaluation has been undertaken. Reccomendation is to reassess wells and shallow soil sediment samples in 2017 and 2020. 2016-2017. The Consultant recommended that the future action plan should be monitored natural attenuation with sampling in 2017 and 2020 for a total cost of $22,500 in 2017 and $29,950 in 2020 plus PWGSC fees. No activity was conducted at the site in FY 19/20 and no expenditure was undertaken.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km30
5 km420
10 km993
25 km1,061
50 km1,061

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $183,668.00
  • Remediation

    $261,214.78

FCSAP Expenditures

  • Remediation

    $51,621.97

Financial/Annual Information

2023-2024click to collapse contents 

2023-2024

  • Reporting Organization

    Public Services and Procurement Canada
  • Internal Identifier

    Western 29864001
  • Highest Step Completed

    08 Implement Remediation/Risk Management Strategy
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $30,000.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2022-2023click to expand contents 

2021-2022click to expand contents 

2020-2021click to expand contents 

2019-2020click to expand contents 

2018-2019click to expand contents 

2017-2018click to expand contents 

2016-2017click to expand contents 

2015-2016click to expand contents 

2014-2015click to expand contents 

2013-2014click to expand contents 

2012-2013click to expand contents 

2011-2012click to expand contents 

2010-2011click to expand contents 

2009-2010click to expand contents 

2008-2009click to expand contents 

2007-2008click to expand contents 

2006-2007click to expand contents 

2005-2006click to expand contents 

 

loading