Site 55793017 - Adjacent to transformer building 600.(Bldg 24/600)

  • Status

    Long term monitoring completed. No further action required.
  • Site Status

    Closed
  • Classification

    Medium Priority for Action

Site Details

Site Location

Locate this site on map
  • Latitude, Longitude

    47.3078, -53.9836
  • Municipality

    Placentia, NL
  • Federal Electoral District

    Avalon

Site Management Strategy

  • Periodic Monitoring

Contaminant Details

Contamination Estimate

  • Cubic Meters

    400

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Soil
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Soil
Other organics Groundwater
Other organics Soil

Action Plan

Remove additional impacted soil for destruction/treatment. Hazardous waste removal and long term monitoring is also required. Confirmatory sampling and reporting to be completed. PCB soil on site has been sent for destruction to Quebec. Monitoring is no longer required.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km53
5 km450
10 km3,160
25 km5,173
50 km20,881

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $55,176.29
  • Remediation

    $248,281.57

FCSAP Expenditures

  • Remediation

    $106,931.16

Financial/Annual Information

2015-2016click to collapse contents 

2015-2016

  • Reporting Organization

    Public Services and Procurement Canada
  • Internal Identifier

    Atlantic 55793017
  • Highest Step Completed

    10 Long-Term Monitoring (Optional)
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $1,362.25
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    400 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2014-2015click to expand contents 

2013-2014click to expand contents 

2012-2013click to expand contents 

2011-2012click to expand contents 

2010-2011click to expand contents 

2009-2010click to expand contents 

2008-2009click to expand contents 

2007-2008click to expand contents 

2006-2007click to expand contents 

2005-2006click to expand contents 

 

loading