Site N0010001 - Screening Plant/Boneyard

  • Status

    Confirmatory sampling completed. No further action required.
  • Site Status

    Closed
  • Classification

    Insufficient Information

Site Details

  • Reporting Organization

  • Reason for Involvement

    Contractual obligation
  • Property Type

    Non-Federal (Provincial Government)

Site Location

Locate this site on map
  • Latitude, Longitude

    69.108056, -105.138333
  • Municipality

    Cambridge Bay, NU
  • Federal Electoral District

    Nunavut

Contaminant Details

Contamination Estimate

  • Hectares

    1

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Not Available
PAHs (polycyclic aromatic hydrocarbon) Not Available

Additional Information

The 1995 EBS identified that the concentration of petroleum hydrocarbons at the site exceeds selected remediation criteria but did not pose a risk to human health or wildlife. In 1996, a sample was collected by the GNWT. This sample reported elevated concentrations of benzene and toluene. In 1999 no sample was collected from YCB-04 as the bailer was frozen in groundwater at the bottom of the well.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km14
5 km1,712
10 km2,969
25 km3,558
50 km3,558

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $76,048.08

FCSAP Expenditures

  • Assessment

    $76,048.08

Financial/Annual Information

2012-2013click to collapse contents 

2012-2013

  • Reporting Organization

    Transport Canada
  • Internal Identifier

    N0010001
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2011-2012click to expand contents 

2010-2011click to expand contents 

2009-2010click to expand contents 

2008-2009click to expand contents 

2007-2008click to expand contents 

2006-2007click to expand contents 

2005-2006click to expand contents 

 

loading