Site N7093001 - CF-18 Crash Site - A/C 188745 (Aug. 05)

  • Status

    Confirmatory sampling completed. No further action required.
  • Site Status

    Closed
  • Classification

    Medium Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    Federal activities
  • Property Type

    Non-Federal (Provincial Government)

Site Location

Locate this site on map
  • Latitude, Longitude

    48.963999, -69.963023
  • Municipality

    Lac-au-Brochet, QC
  • Federal Electoral District

    Manicouagan

Site Management Strategy

  • Periodic Monitoring
  • Additional assessment

Contaminant Details

Contamination Estimate

  • Cubic Meters

    130

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Surface water
PHCs (petroleum hydrocarbons) Groundwater
PHCs (petroleum hydrocarbons) Soil
BTEXs (benzene, toluene, ethylbenzene, and xylene) Surface water
BTEXs (benzene, toluene, ethylbenzene, and xylene) Groundwater
BTEXs (benzene, toluene, ethylbenzene, and xylene) Soil
PAHs (polycyclic aromatic hydrocarbon) Surface water
PAHs (polycyclic aromatic hydrocarbon) Groundwater
PAHs (polycyclic aromatic hydrocarbon) Soil
Metal, metalloid, and organometallic Soil
PCBs (Polychlorinated Biphenyl) and PCDD/Fs (polychlorinated dibenzo-p-dioxin/dibenzofuran) Soil
Other organics Soil
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Soil

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km0
5 km0
10 km0
25 km0
50 km0

Summary of Annually Reported Data

Total Expenditures

  • Remediation

    $58,846.74

Financial/Annual Information

2018-2019click to collapse contents 

2018-2019

  • Reporting Organization

    National Defence
  • Internal Identifier

    0476-C001
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2017-2018click to expand contents 

2016-2017click to expand contents 

2015-2016click to expand contents 

2013-2014click to expand contents 

2012-2013click to expand contents 

2009-2010click to expand contents 

2008-2009click to expand contents 

2007-2008click to expand contents 

2006-2007click to expand contents 

2005-2006click to expand contents 

 

loading