Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 131 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00024130
Norman Wells Maintenance Garage UST |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00024131
Norman Wells Taxiway C |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024132
Underground Storage Tank (UST) Decommission |
Long term monitoring completed. No further action required. | 2013-2014 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
00024290
Cambridge Bay Shoreline Disposal |
Confirmatory sampling completed. No further action required. | 2012-2013 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00024301
Cambridge Bay Apron |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024598
Iqaluit Utilidor near DND |
Detailed testing completed. No further action required. | 2013-2014 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00024670
Historic Military Base West of Runways - APEC 20C |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025560
Yellowknife Maintenance Garage Asbestos |
Detailed testing completed. No further action required. | 2013-2014 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00026076
Iqaluit Airport - FTA - 900 cubic metres |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00026121
Watson Lake Former Ammunition Storage Depot - APEC 11 |
Historical review completed. No further action required. | 2019-2020 | 02 Historical Review | |
00027784
Iqaluit |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00028015
Area between Terminal Building and Control Tower - Former Biosystem Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20051001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
20146001
Air Terminal Building APEC 20A Parking Lot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20146002
Yukon Transportation Museum |
Detailed testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20146003
Former Tenant Air Fuelling Facility - APEC 6 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146004
Regional Fire Depot - APEC 8 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20146005
Historical Hangars A, B, and C and Aprons APEC 10 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20146006
Former PCBs Storage Area - APEC 36 |
Detailed testing completed. No further action required. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
20146007
Historic On-Site Fuel Distribution Pipeline - APEC 14A |
Initial testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20146009
Historical On-Site Buildings - APEC 40 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146010
Former Fire Hall (Current Sand Storage Building) - APEC 4 |
Initial testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20146011
Former On-Site Munitions/Ordnance Storage- APEC 33 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
20146012
Historic 6 Bay Garage - APEC 11 |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146013
Historic Fleet Fuelling Station - APEC 5 |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20146016
Historic Upper Air Weather Station - APEC 21 |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
20146017
On-Site Dump- APEC 37 |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
20146018
Former Drums in Baxter's Ravine - APEC 1 |
Initial testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20146019
Operating Field Electrical Centre - APEC 17 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20146020
Off-Site Fuel Distribution System - APEC 48 |
Historical review completed. No further action required. | 2011-2012 | 02 Historical Review | |
20146021
Operating Fire Hall/Tenant Cargo Facility - APEC 13 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
20146022
Historical Off-Site Underground Munitions/Ordinance Storage - APEC 45 |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
20146023
Operating Maintenance Garage/Carpenter's Shop - APEC 9 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
20146024
Tenant Tanker Base - APEC 28 |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
20146025
APEC 14B - Tennant Large AST Compound |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20906001
Air Navigation Facility: Receiver |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
20907001
Air Navigation Facility: Transmitter |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
20908001
Air Navigation Facility: Garage |
Remediation / risk management completed. No further action required. | 2005-2006 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20922001
Air Navigation Facility: Non Directional Beacon |
Detailed testing completed. No further action required. | 2011-2012 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
21090001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2008-2009 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
21225001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
21232001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
21233001
Air Navigation Facility: VHF Omnidirectional Range |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
22131001
Air Navigation Facility: VHF Omnidirectional Range |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
23466001
Air Navigation Facility: VHF Omnidirectional Range |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
34089001
Air Navigation Facility: VHF Omnidirectional Range |
Confirmatory sampling completed. No further action required. | 2008-2009 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
36427001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
58210001
Air Navigation Facility: VHF Omnidirectional Range |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
72061001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
72063001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
C0017001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0018001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0020001
Air Navigation Facility: Garage |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0023001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0025001
Air Navigation Facility: Remote Communications Outlet |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0026001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0027001
Air Navigation Facility: Transmitter |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
C0028001
Air Navigation Facility: VHF Omnidirectional Range |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
C0029001
Air Navigation Facility: Localizer |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
C0030001
Air Navigation Facility: Non Directional Beacon |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
C0032001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2001-2002 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C0033001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
C0034001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
C0036001
Air Navigation Facility: Housing/Dwelling/Residence |
Confirmatory sampling completed. No further action required. | 2001-2002 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0010001
Screening Plant/Boneyard |
Confirmatory sampling completed. No further action required. | 2012-2013 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0010002
Fire Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0010003
Former Tank Farm |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
N0010004
Former AST Location North of T-5. |
Confirmatory sampling completed. No further action required. | 2012-2013 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0011001
Old Maintenance Garage UST and AST |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0011002
Hazardous Material Storage |
Historical review not required. | 2002-2003 | 01 Identify Suspect Sites | |
N0011003
Fire Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0011004
Field Electrical Centre |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0011005
Former Firing Range |
Confirmatory sampling completed. No further action required. | 2002-2003 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0012001
Fire Training Area |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0012002
Air Terminal Building |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
N0012003
Tar Dump Site |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0012004
Former Firing Range |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0012005
Airside Dump Site |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0012006
Maintenance Garage Asbestos Abatement |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0013001
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0013002
Former UST Tank Farm, Maintenance Garage |
Confirmatory sampling completed. No further action required. | 2004-2005 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0013003
Crawl Space Under Maintenance Garage |
Confirmatory sampling completed. No further action required. | 2004-2005 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0013004
Sewage Lagoon |
Long term monitoring completed. No further action required. | 2011-2012 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
N0014001
Maintenance Garage |
Long term monitoring completed. No further action required. | 2012-2013 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
N0014002
Fire Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0014003
Shell Lake |
Long term monitoring completed. No further action required. | 2011-2012 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
N0014004
Landfill |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0015001
Former USAF Tank Farm |
Confirmatory sampling completed. No further action required. | 2014-2015 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0015002
Fire Training Area |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0015003
Old Asphalt Plant |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0015004
Drum Cache #1 |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0015005
Bitumen Drum Cache - Iqaluit Airport |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0015006
Landfill/Scrap Metal Dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0015007
Iqaluit Airport Apron I Hydrant Remediation |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0015008
Iqaluit Airport Utilidor Asbestos Abatement |
Confirmatory sampling completed. No further action required. | 2008-2009 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0015009
Iqaluit Airport Sea Can/Drum Remediation |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0016001
Air Services Building |
Confirmatory sampling completed. No further action required. | 2010-2011 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0016002
Fire Training Area |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0016003
Old Land Treatment Unit (LTU) |
Confirmatory sampling completed. No further action required. | 2012-2013 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0017001
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0017002
Building #4 |
Confirmatory sampling completed. No further action required. | 2012-2013 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0017003
Old Landfill/Main Drum Cache |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0017006
Parcel 9 |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
N0018001
Bulk Storage Tanks |
Initial testing completed. No further action required. | 2019-2020 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N0018002
Fire Training Area/Land Treatment Unit |
Confirmatory sampling completed. No further action required. | 2005-2006 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0018003
Apron III |
Initial testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N0018004
Leased Site |
Long term monitoring completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
N0018005
Snow Dump Area/Landfill |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N0129001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2006-2007 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
N0281001
Gully Dump - APEC 3 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281002
Fire Training Area - APEC 1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281003
Historic Parcel F Dump / Capped Landfill - APEC 4 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281004
Terminal Area |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
N0281005
Old Dump Site - APEC 8 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281006
Operating and Historic Float Plane Bases - APEC 16 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0281007
Drums in Watson Lake - APEC 5 |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0281008
Former USTs (Maintenance Garage and Hangar) - APEC 6 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281010
Former Tenant-Owned Fuel Underground Storage Tank - APEC 9 |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
N0281011
Tenant-Owned Petro-Refuelling Site - APEC 10 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0281012
Historic Military Base - APEC 22 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281014
Historic Sanitary Sewers and Lagoon - APEC 15 |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
N0281015
Historic Military Base - APEC 23 |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
N0281016
Historic Tank Farm - APEC 32 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281017
Historic Fuel Pipeline - APEC 31 |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
N0281018
Operating Automobile Fuelling Station - APEC 19 |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
N0281019
Operating INAC Air Tanker Base - APEC 26 |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
N0281020
Former Drum Dump - APEC 25 |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
N0281021
War-Era Weapons Artifacts Storage - APEC 28 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
N0281022
Historic Borrow Pit with Dump - APEC 27 |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
N0281023
Old U.S. Military Section Dump- APEC 2 |
Remediation / risk management completed. No further action required. | 2020-2021 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
N0281024
Former PCB Storage Facility - APEC 24 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
- Version:
- 40