Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | Province or Territory (descending) |
Sites Found: | 158 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00006221
633 - Quatsino - 07077 - GRASS POINT 13 - 7000012794 |
Historical review completed. Initial testing underway. | 2023-2024 | 2 Medium Priority for Action | 02 Historical Review |
00006600
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007593 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008209
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - BC04826011 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008420
CFB Petawawa RTA - Old Grenade Range |
Long term monitoring completed. No further action required. | 2018-2019 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00008429
South Escarpment Stillwaters (SES 1100 series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008659
COL-40 Colwood North Western Bank of Dunn's Nook |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012463
Burgeo (SAR Station - Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00012676
KINGSTON (CONFEDERATION BASIN)(Waterlot) |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012796
WHEATLEY (Waterlot Throughout Harbour) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00012845
Trenton Parking Lot |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013051
RED HEAD - Sediment Impacts-Hydrocarbons, DDT, PCBs, Metals |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013081
Jerseyside (Waterlot) |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013133
Conche (Waterlot - DFRP# 01585) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013142
Harbour Breton Wharf Site Waterlot - DFRP # 00626 |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 05 Detailed Testing Program |
00013170
NORTH HEAD -FISHERMEN'S WHARF (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013195
CLARK'S HARBOUR ( Sed impacts) |
Initial testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013202
BROOKLYN-FISHERMEN'S WHARF / SKIDWAY (Impacted Sediment) |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013235
YARMOUTH BAR (Impacted Sediments) |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013259
Riverhead (West - DFRP # 00072 - Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00013260
Cape Broyle (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013261
Carbonear (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013265
Hearts Delight (DFRP# 00161 - Waterlot - wharf site) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00016562
CONSTANCE BAY - No Contamination Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017782
GLACE BAY (Sediment impacts) |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017871
NORTHWEST COVE (sed impacts PCB and PAH) |
Initial testing completed. No further action required. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017917
SONORA (PAHs sediment impacts) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00017940
WEST DOVER (sed impacts) |
Detailed testing completed. No further action required. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00017987
MILLIGANS SHORE - Sediment impact (historic activities) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00018088
RICHARDSON (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019018
Beaumont (Waterlot - DFRP# 01479) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019021
Black Duck Brook (SCH - Waterlot - DFRP# 55678) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00019036
BROWNS COVE (HEATHERTON - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | n Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019042
Burnt Islands (Waterlot - DFRP# 34775) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019043
Calvert (Wharf Site - Waterlot Property - DFRP # 00032) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019048
Cape St. Georges (Rouzes Brook - Waterlot - DFRP# 34782) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019053
Centreville (SCH - Waterlot - DFRP# 01238) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019058
Coachmans Cove (Waterlot - DFRP# 34804) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019084
Eddie's Cove East |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019085
Eddie's Cove West |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019086
Fair Haven (Wharf Site - DFRP# 23017 - Waterlot) |
Remediation / risk management completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019096
Fogo (SCH - Wigwam Point - Waterlot - DFRP# 01356) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019106
Frenchman's Cove (Bay of Islands - SCH - Waterlot - DFRP# 00942) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019121
Greensponds (SCH - Marginal Wharf - Uplands & Waterlot - DFRP# 01244) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019126
Happy Adventure (Fish Plant - Waterlot - DFRP# 01192) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019145
Herring Neck (Goshen's Arm - Waterlot - DFRP# 01402) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019148
Hickmans Harbour (DFRP# 01064 - Waterlot) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00019212
Margaree (Waterlot - DFRP# 00713) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00019248
Pacquet (Waterlot - DFRP # - 01543) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019259
Plate Cove East (Waterlot and Uplands -DFRP# 01156) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00019273
Port Saunders (DFRP 01644 - Waterlot - West) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019290
Ramea (SCH - Waterlot - DFRP# 00701) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00019331
Southport (Waterlot - DFRP# 01040) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019349
St. John's (Prosser's Rock - Waterlot - DFRP# 55785) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019361
Stag Harbour (SCH - Waterlot - DFRP# 01338) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00019391
Wild Cove (Waterlot - DFRP# 22968) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019401
Brent's Cove (SCH Wharf Site - DFRP# 55654) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021081
Ruskin Spawning Channel |
Initial testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021175
Tsolum River Hatchery, Headquarters Creek - Potential Hazardous Building Materials |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00021295
Cowichan Bay (Contaminated Sediment) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022079
L'ANSE-À-VALLEAU (SCH,WATERLOT) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022086
LES MECHINS (FISHING WHARF, SCH, WATERLOT, WHARF) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022167
Wharf, sediments (PCB) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022172
RIVIÈRE-ST-PAUL (ESQUIMAUX ISLAND, SCH, WATERLOT, SEDIMENTS) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022932
WEDGE POINT (WEDGEPORT) - No Sediment Impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022996
Burgeo (L-SHAP e Finger Pier Site Waterlot - DFRP# 34528) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023000
Codroy (Waterlots - DFRP# 00779 & 00783) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023033
Hant's Harbour (L-Shaped Finger Pier Site - Waterlot -DFRP#00181) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023061
Quidi Vidi (DFRP# 34830/34970 - Water Lot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00023391
Kingston Inner Harbour Marsh |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023451
Upper Rideau Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023452
Newboro Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023453
Indian Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024057
Montreal Road Complex ON |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024148
GLACIER BAY |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00024345
Greensponds (SCH - Floating Dock Site - Uplands & Waterlot - DFRP# 55910) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024520
Ramea (SCH - Waterlot - DFRP# 34542) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025328
South Bar (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025559
Fortune Harbour Bed |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00025835
554 - Tla'amin Nation - 07961 - SLIAMMON 1 - BC04848714 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00026097
Baie Verte (Waterlot Parcel) |
Confirmatory sampling completed. No further action required. | 2022-2023 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027693
Holyrood Harbour Bed |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00173002
Heart's Content (DFRP# 00173 - Waterlot) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00506001
Public Harbour and Wharf |
Long term monitoring completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00626002
Harbour Breton (DFRP # 00627 - Waterlot) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00626003
Harbour Breton - Fish Plant Wharf (Waterlot only) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00651001
Sandyville (Dawson's Cove - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00723001
Port aux Basques Ferry Terminal |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00726001
Public Harbour |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00748001
Channel-Port aux Basques (Waterlot) |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01183002
Glovertown (Waterlot Property) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
01208002
Salvage (Waterlot Property) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01333002
Seldom Come By (South - Waterlot - DFRP# 01333) |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01334002
Deep Bay (Waterlot Property) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01600001
Trout River |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
01778001
Forteau (SCH - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
01822087
South Escarpment Landfills (SES 1000 Series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822094
Lower Tank Farm (LTF 2000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01955001
Sediment POD |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739012
Meadowview Landfill - Aldershot |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02739055
Peach Lake - Aldershot |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
02762001
Newport Corner (3101) - Comp. Tech. Building (B9) |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859018
CFAD Bedford (819) - Existing Jetty |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02884012
Melville Island (5912) - Mooring Field |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02898001
Bedford Basin Measured Mile Beacon - PCB, PAH, and metals in sediments of Waterlot |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
02919005
Dockyard (1005) - PMQ's and Garage (D77, D78, D79 & D81) |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919010
Dockyard (1010) - Electronics Shop (D20) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919032
Water Lots (9908) - Dockyard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03057005
Air Canada & Air Canada Cargo (Bennery Brook) |
Remediation / risk management completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03057011
Maintenance Area (Bennery Brook) |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03759003
Canadian Coast Guard College (Metal/PAH impacts in Crawley Creek Sediment) |
Remediation / risk management completed. No further action required. | 2016-2017 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03765001
Real Property |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03907003
PORT CREDIT (Waterlot) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 05 Detailed Testing Program |
04042001
BLACKS HARBOUR (PCB's-Metals-PAH's in sediment) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05020004
642 - Cowichan - 06799 - COWICHAN 1 - 7000019894 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05095006
595 - Tsal'alh - 08151 - SLOSH 1 - 7000070396 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05906047
Former dump Château Road |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959001
Canal sediments |
Detailed testing completed. No further action required. | 2014-2015 | 1 High Priority for Action | 05 Detailed Testing Program |
09401040
Alaska Highway - Steamboat Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09445001
Fort Frontenac Water Lots |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09461003
Water Lot |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 05 Detailed Testing Program |
09540012
8 W Fire Fighting Training Area /Hazardous Materials Storage |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09731003
Goose Bay - Sturgeon Lake |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
09731004
D26 Little Lake to Rice Lake |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11406001
STURGEON FALLS (Waterlot) |
Historical review completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 02 Historical Review |
11994001
NIPIGON (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
14976042
490 Site - 604 Layout (EPG) Coyote & Rabbit Rds |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17348003
Lot 2A: Middle Harbour Fill Site; Harbour Floor |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17348007
Lot 6: Swift Street; Herald Street Property; Pembroke Street Fill; Swift Street Fill; Herald Street North Fill; Store Street |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17348020
Lot 17: Victoria Harbour Floor; Point Ellice (Bay Street); Johnson Street; Point Ellice (Bay Street); East Selkirk; Macaulay |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
17403011
ESQ-1 - Esquimalt Harbour |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
17410007
Esquimalt Graving Dock Waterlot - AEC's 11,15 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17410014
Esquimalt Graving Dock - Canadian Forces Sailing Association (CFSA) Waterlot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
21352001
Site 21352001 - Drummond Barrel (1979) Inc. |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
22430002
GEORGETOWN - FISHERMEN'S WHARF ((PAH, PCB & Metal Impacts in Waterlot Sediment) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
22905009
Inner Harbour |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22967002
Bridgeport (Waterlot Property) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
28614001
SIOUX LOOKOUT - LAUNCHING RAMP (Waterlot) |
Historical review completed. No further action required. | 2005-2006 | N Not a Priority for Action | 02 Historical Review |
29757001
Small calibre (Former dump), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757002
Dry material (former dump for), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757014
South Outfall, DRDC-South |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
29757024
North Outfall, DRDC-North |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
30017002
Belleoram (Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
31513001
NORTH BAY-MARINA (Waterlot) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
32668002
Fermeuse (Lumley's Cove Waterlot -32668) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
32668003
Fermeuse (Sheeps Head Cove Waterlot - 00040) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34337002
VIC-1 HMCS Malahat Waterlot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34476004
Mtn View - Inner Landfill Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34627002
Rose Blanche (Water lot - DFRP# 34772) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34627004
Rose Blanche (Diamond Cove Waterlot - DFRP# 34627) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
34819001
Flowers Cove (SCH - Waterlot - DFRP# 34819) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
54012002
PETERBOROUGH (WOLFE STREET)(Waterlot Much of the Property) |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
56156002
Rose Blanche (Bait Depot - Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 1 High Priority for Action | 05 Detailed Testing Program |
56631001
Isle Aux Morts (East - DFRP# 00733 - Waterlot) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
72019003
St. John's (Base - Waterlot) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
80023001
Burin (SAR Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
N7040001
Saglek Bay Sediments |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7075001
Dome Mountain, RCAF and Camp Sites (5 W) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
- Version:
- 40