00000467
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - 0302094305
Confirmatory sampling completed. No further action required. 2014-2015 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00000569
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - 0302216905
Historical review planned. 2023-2024   01 Identify Suspect Sites
00001288
Sainte-Marie Island
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00002367
Romaine River
Detailed testing completed. No further action required. 2016-2017 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00002368
Natashquan River downstream Lake Aliecte Discharge
Detailed testing completed. No further action required. 2016-2017 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00002757
Romaine River
Historical review not required. 2010-2011   01 Identify Suspect Sites
00002758
Natashquan River downstream from the outlet of Aliecte Lake
Historical review not required. 2010-2011   01 Identify Suspect Sites
00005215
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - 0302542305
Historical review completed. No further action required. 2017-2018   02 Historical Review
00005309
82 - Les Innus de Ekuanitshit - 06137 - MINGAN - 0302551705
Historical review planned. 2023-2024   01 Identify Suspect Sites
00005324
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - 0302553205
Confirmatory sampling completed. No further action required. 2016-2017 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00005977
82 - Les Innus de Ekuanitshit - 06137 - MINGAN - 0302618505
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00005990
83 - Première Nation des Innus de Nutashkuan - 06108 - NUTASHKUAN - 0302619805
Historical review planned. 2023-2024   01 Identify Suspect Sites
00006143
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - 0302635105
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00006274
88 - Montagnais de Pakua Shipi - 06139 - ST-AUGUSTIN INDIAN SETTLEMENT - 2000043398
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00006606
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - 0302648806
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00006757
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 / 0302967206
Historical review not required. 2012-2013   01 Identify Suspect Sites
00006823
082 - Les Innus de Ekuanitshit - 06137 - MINGAN - 2000017493
Long term monitoring completed. No further action required. 2000-2001 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
00012396
Rivière aux-Graines - former rear range light
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00012397
Rivière aux-Graines - former front range light
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00012419
Rivière Nétagamiou
Historical review completed. No further action required. 2009-2010   02 Historical Review
00012459
Rivière-au-Tonnerre (C&P)
Historical review completed. No further action required. 2009-2010   02 Historical Review
00012460
Baie Johan Beetz (C&P)
Historical review completed. No further action required. 2009-2010   02 Historical Review
00012467
AGUANISH EST - SCH, WATER LOT.
Historical review not required. 2013-2014   01 Identify Suspect Sites
00012496
MAGPIE (SCH)
Historical review completed. No further action required. 2015-2016   02 Historical Review
00012539
KEGASKA (LANDING WHARF, SCH)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00013226
Niapisca South - former beacon
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00013227
Niapisca North - day beacon
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00013228
Grande Île - former beacon
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 05 Detailed Testing Program
00013229
Île aux Bouleaux - former landmark, divested.
Initial testing completed. No further action required. 2009-2010 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013230
Marteau Island, Big - former beacon, ceded
Remediation / risk management completed. No further action required. 2020-2021 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00013306
Havre-Saint-Pierre (lifeboat station)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00013322
Mingan, western entry to - rear range light
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00013323
Mingan, eastern entry to - front range light
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00013324
Natashquan, Little - rear range light
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013325
Mackenzie Point - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00013326
Milne Point - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00013327
Tête-à-la-Baleine - int., front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00013328
Entrance Island - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00013329
Inner Island - front range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
00013330
Paul Nadeau Island - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00013331
Mermettes Island - minor shore light
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
00013332
Whitely Island - rear, day beacon
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00013333
Whitely Island - front, day beacon
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00013334
Perche Point - front day beacon
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00013335
Perche Point - rear day beacon
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00021903
Blanc-Sablon (area office)
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00021916
Rivière-au-Tonnerre
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021917
Rivière-au-Tonnerre
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021918
Shore light (Zn)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021919
Baie de Magpie, ancien poste de signal, cédé
Detailed testing completed. No further action required. 2012-2013 2 Medium Priority for Action 05 Detailed Testing Program
00021920
Perroquets Island - light station
Remediation / risk management completed. No further action required. 2015-2016 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00021921
Mingan - land for JP-4 tank, ceded
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00021922
Cugnet
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
00021923
Mingan, western entry to - front range light
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00021924
Mingan, eastern entry to - rear range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00021925
Mingan - west, former beacon
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00021926
Mingan, Longue-Pointe-de, former comm. Site
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021927
Former site of lighthouse
Detailed testing completed. No further action required. 2012-2013 3 Low Priority for Action 05 Detailed Testing Program
00021928
Baie Ellis
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021929
Abandoned tank
Initial testing completed. No further action required. 2008-2009 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021930
La Grande Pointe
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021931
Havre-Saint-Pierre, former RRL
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021932
Havre-Saint-Pierre
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021933
Havre-Saint-Pierre
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021934
Havre-Saint-Pierre (former wharf light, ceded)
Historical review completed. No further action required. 2014-2015   02 Historical Review
00021935
Pointe aux Esquimaux
Initial testing completed. No further action required. 2012-2013 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021936
Havre-Saint-Pierre (radar/telecommunications site)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00021937
Baie Johan Beetz (inner)
Historical review completed. No further action required. 2012-2013   02 Historical Review
00021938
Corneille - former range site, ceded
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021939
Aguanish (rear range light)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021940
Gull - former beacon, ceded
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021941
Joncas Island - minor shore light
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
00021942
Black Rock - day beacon
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021943
Natashquan (radar/telecommunications site)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021944
Natashquan station DECCA
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00021945
Kegaska (front range light)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021946
Kegaska (rear range light)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021947
Kégashka
Historical review completed. No further action required. 2009-2010   02 Historical Review
00021948
Kegaska, Point of - minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
00021949
Kippin - former beacon, ceded
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021950
La Romaine (radar/telecommunications site)
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00021951
Gethsémani - berthage, former RL, ceded
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021952
Gethsémani harbour - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021953
Gethsémani harbour - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021954
Petit Lac Point - front range light
Detailed testing completed. No further action required. 2019-2020 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00021955
Petit Lac Point - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021956
Treble Island - minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021957
Mackenzie Point - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00021958
Green - former beacon, ceded
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021959
Milne Point - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021960
du Large Island - former beacon, ceded
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021961
Island 37 - former beacon, ceded
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021962
Cormoran Rocks - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00021963
Chevery (former land for JP-4 tank)
Remediation / risk management completed. No further action required. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021964
Harrington Harbour
Historical review completed. No further action required. 2009-2010   02 Historical Review
00021965
Harrington Harbour (front range light)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021966
Harrington Harbour (rear range light)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021967
Harrington Harbour (radar/telecommunications site)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00021968
Cape Airey - minor shore light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021969
Entrée Cliff - minor shore light
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
00021970
Entry Island - minor shore light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021971
Tête à la Baleine (outer)
Historical review completed. No further action required. 2012-2013   02 Historical Review
00021972
Tête-à-la-Baleine - ext., rear range light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021973
Tête-à-la-Baleine - centre, front range light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021974
Tête à la Baleine
Historical review completed. No further action required. 2009-2010   02 Historical Review
00021975
Tête-à-la-Baleine - centre, rear range light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00021976
Baie des Moutons
Historical review completed. No further action required. 2012-2013   02 Historical Review
00021977
Mutton Bay - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00021978
La Tabatière Bay - int., front light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021979
La Tabatière Bay - int., rear light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021980
La Tabatière Bay - ext., front light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00021981
La Tabatière Bay - ext., rear light
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00021982
Saint-Augustin inlet
Historical review completed. No further action required. 2009-2010   02 Historical Review
00021983
de la Boule Island - minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021984
Guet Island - minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021985
Cormandière Island - minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021986
Mistanoque Island - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021987
Île Robin
Historical review completed. No further action required. 2012-2013   02 Historical Review
00021988
Vieux-Fort Channel - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00021989
Vieux-Fort Channel - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00021990
Sol : copper
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00021991
Vieux-Fort Bay - wharf light
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00021992
Lessard - former beacon, ceded
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021993
Rivière Saint-Paul
Historical review completed. No further action required. 2012-2013   02 Historical Review
00021994
Link - former beacon, ceded
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021995
Stone Island - former rear range light
Historical review completed. No further action required. 2015-2016   02 Historical Review
00021996
Esquimaux Island - former front range light, ceded
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021997
Esquimaux Island - former rear range light, ceded
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00021998
Middle Bay - minor shore light
Remediation / risk management completed. No further action required. 2020-2021 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00021999
Middle Bay - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022000
Saumon - former beacon, ceded
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00022001
Brador Bay - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00022002
Brador Bay - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00022003
Blanc-Sablon (wharf light)
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00022004
Greenly Island - minor shore light
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00022005
Blanc-Sablon (2 Riverside Street, ceded)
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
00022006
Blanc-Sablon (ancien hangar, terrain cédé)
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 05 Detailed Testing Program
00022007
Blanc-Sablon (storage, ceded)
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
00022008
Lourdes-de-Blanc-Sablon
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00022009
Lourdes-de-Blanc-Sablon (duplex)
Historical review not required. 2015-2016   01 Identify Suspect Sites
00022032
AGUANISH OUEST - SCH, waterlot, wharf periphery, sediments
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022033
AGUANISH OUEST - SCH, land lot, service shed and storage area
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022035
AYLMER SOUND (PORT HARRINGTON, SCH, WATERLOT, sediments)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022036
BRADOR BAY - SCH, LAND LOT, TIMBER WHARF
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022037
MUTTON BAY - SCH, WATERLOT, SEDIMENTS
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022038
BAIE-JOHAN-BEETZ
Historical review completed. No further action required. 2012-2013   02 Historical Review
00022039
BLANC-SABLON (LARGE FISHING WHARF, SCH, LAND LOT)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022048
CHEVERY - CROSS RIVER, WHARF, SCH, LAND LOT, WHARF, SOILS
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00022049
CHEVERY - CROSS RIVER, WHARF, SCH, WATERLOT AROUND WHARF, SEDIMENTS
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022067
Edge of West Wharf
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00022068
Terrasse and concrete ramp, outside the property
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00022072
KEGASKA (EASTERN SLIPWAY, SCH, LAND LOT)
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
00022073
KEGASKA (EASTERN SLIPWAY, SCH, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022084
LA TABATIÈRE (FISHERIES SECTION, SCH, WATERLOT, FISHING WHARF, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022096
MIDDLE BAY (SCH, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022124
RIVIERE-AU-TONNERRE (RIVER, SCH, WATERLOT, FISHING WHARF, SEDIMENTS) Fishing wharf
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022128
RIVIÈRE-ST-PAUL (VILLAGE, SCH)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022133
SALMON BAY (SCH, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022136
ST-AUGUSTIN (RIVER, SCH, WATERLOT, SEDIMENTS)
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 05 Detailed Testing Program
00022156
OLD FORT BAY - FISHING WHARF, SCH
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00022157
MINGAN (SCH, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022158
Cale de halage
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022159
TÊTE-À-LA-BALEINE (FISHING WHARF, SCH, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022165
BLANC-SABLON (SLIPWAY, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022166
BLANC-SABLON (SMALL FISHING WHARF, SCH, WATERLOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022172
RIVIÈRE-ST-PAUL (ESQUIMAUX ISLAND, SCH, WATERLOT, SEDIMENTS)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00022175
RIVIERE-ST-PAUL (CHEVALIER BAY, SCH)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00022178
Access road and Service area
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00022179
Launching ramp (sediments)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00022180
BRADOR BAY - UDELL ISLAND, SCH
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00022907
Old Fort wharf - sediments
Confirmatory sampling completed. No further action required. 2018-2019 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00022936
Natashquan, point of – former reference light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024061
Saint-Augustin wharf - water lot - sediments
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00024084
Saint-Augustin port facility
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024085
Land and sediments
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024086
Land and sediments
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024087
Land and sediment
Initial testing completed. No further action required. 2023-2024   03 Initial Testing Program
00024088
Land and sediments
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00024089
Airport land
Initial testing completed. No further action required. 2019-2020   03 Initial Testing Program
00024677
Installations portuaires de Harrington Harbour
Remedial action plan completed. Remediation / risk management underway. 2023-2024 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00025336
Chevery (current JP-4 tank)
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
00025954
84 - Montagnais de Unamen Shipu - 06109 - ROMAINE 2 - QC04869616
Remediation / risk management completed. No further action required. 2017-2018 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00026106
Harrington Harbour - water lot - sediments
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00026111
Natashquan airport land
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00026133
Chevery airport (full site)
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
00026487
83 - Première Nation des Innus de Nutashkuan - 06108 - NUTASHKUAN - QC04877017
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00027689
Old Fort site
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00027766
Land of a tenant - storage tanks sector
Detailed testing completed. No further action required. 2021-2022 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
05206001
084 - Montagnais de Unamen Shipu - 06109 - ROMAINE INDIAN RESERVE NO. 2 - 2000044198
Long term monitoring completed. No further action required. 2000-2001 1 High Priority for Action 10 Long-Term Monitoring (Optional)
05334001
083 - Montagnais de Natashquan - 06108 - NATASHQUAN INDIAN RESERVE NO. 1 - 2000012393
Long term monitoring completed. No further action required. 2000-2001 1 High Priority for Action 10 Long-Term Monitoring (Optional)
08024002
Cap-de-la-Table (light station)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
08025001
Carleton Point – light station
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
08028002
Heath Point - trailers, light station, heliport and tanks
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
08029002
Cap-de-Rabast (light station and adjacent concrete bases)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
08031003
Sud-Ouest Point - former light station and tower
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08032001
Bagot - escarpment, minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08033001
Hydrocarbons and heavy metals
Remediation / risk management completed. No further action required. 2008-2009 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08033002
Two houses with shed ( Cu, Pb,Zn.Hg)
Remediation / risk management completed. No further action required. 2008-2009 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08033003
Concrete slab of former garage (C10-C50, C,P,Z)
Remediation / risk management completed. No further action required. 2008-2009 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08033004
Minor shore light with adjacents buildings
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
08033005
Ruins of former light with fog alarm
Remediation / risk management completed. No further action required. 2008-2009 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08033006
Fog alarm and former residence - Diesel
Remediation / risk management completed. No further action required. 2008-2009 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08033007
Concrete slab (former ressidence - diesel)
Remediation / risk management completed. No further action required. 2008-2009 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08040001
Site occupied by lessee
Detailed testing completed. No further action required. 2018-2019 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
08040002
Natashquan airport
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
08044001
Sediments around wharf
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
08064001
Aguanish (front range light)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08070001
MINGAN (SCH, LAND LOT, SOUTH OF WASTE OIL TANK)
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
08078001
Harbour sediments
Historical review not required. 2001-2002   01 Identify Suspect Sites
08082001
Esquimaux Point - front range light
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
08098001
RIVIÈRE-AU-TONNERRE (RIVER, SCH, LAND LOT, WASTE OIL TANK)
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
08216001
ST-AUGUSTIN (RIVER, SCH, LAND LOT, SERVICE AREA)
Detailed testing completed. No further action required. 2020-2021 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
08217001
RIVIÈRE-ST-PAUL (ESQUIMAUX ISLAND, SCH, LAND LOT, SEDIMENTS)
Initial testing completed. No further action required. 2015-2016 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
08231001
BLANC-SABLON (SLIPWAY, SCH, LAND LOT, SOILS)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
08232001
AYLMER SOUND (PORT HARRINGTON, SCH, LAND LOT)
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
08233001
Transport Canada hangar
Confirmatory sampling completed. No further action required. 2018-2019 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
08236001
MIDDLE BAY (SCH, LAND LOT, SEDIMENTS)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
08240001
Kégaska wharf
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
08240002
Kégaska Wharf - land and sediment
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
08248001
MUTTON BAY - SCH, LAND LOT, WHARF, SOILS
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
08252001
HARRINGTON HARBOUR (SLIPWAY AND WINCH SHELTER, SCH, LAND LOT)
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
08261001
Pump island - lessee depot
Confirmatory sampling completed. No further action required. 2008-2009 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08261002
Lessee depot
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
08261003
Airport land as a whole
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
08267001
Baleine Island - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
08269001
Sainte-Marie Island - minor shore light
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
08280001
Plate Island - Lower North Shore - minor shore light
Remediation / risk management completed. No further action required. 2017-2018 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
08281001
Blanc-Sablon (front range light)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
08309001
NDB site
Long term monitoring completed. No further action required. 2014-2015 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
08316001
Marteau Island, Little – minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
08317001
Firmin Island - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
08318001
Fantôme Island, entry to - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
28744001
Chevery airport
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
30146001
Johan Beetz Bay (front range light)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
31119001
Aquifer - nitrate contamination
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
31119002
Toluene contamination - apron southwest sector
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
36263001
Stone Island - former front range light
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
36614001
Salmon Bay - front range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
36617001
Bursey Island - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
36618001
Nord-Est Point - front range light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
36619001
Robin Island, East - front range light
Detailed testing completed. No further action required. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
36620001
Tickle Island - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
36626001
Saint-Augustin (minor shore light)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
36628001
Paul Nadeau Island - front range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
56036001
Sheldrake - minor shore light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
56455002
Petite-Île-au-Marteau Lighthouse
Initial testing completed. No further action required. 2013-2014 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56455003
Former Lighthouse and other buildings at Île-aux-Perroquets
Remediation / risk management completed. No further action required. 2013-2014 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
82066001
Esquimaux Point - former front range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
82082001
Tête-à-la-Baleine - int., rear range light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
82083001
Blanc-Sablon (rear range light)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
82102001
Johan Beetz Bay (rear range light)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
82120001
Salmon Bay - rear range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
82121001
Inner Island - rear range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
82122001
Robin Island - rear range light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
82123001
Nord-Est Point - rear range light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
82124001
Nord-Est Point - minor shore light
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
82125001
Robin Island, East - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
82126001
Tickle Island - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
82127001
Paul Nadeau Island - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
82202001
Fantôme Island, entry to - rear range light
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
82227001
Natashquan, Little - front range light
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
82237001
Pointe Carleton - former landing.
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 05 Detailed Testing Program
82268001
Bursey Island - front range light
Detailed testing completed. No further action required. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
82341001
Ellis Bay - front range light
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
82342001
Aigle - former range site
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
82343001
Menier - former beacon
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
82534001
Johan Beetz Bay (int., front light)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N0123001
Air Navigation Facility: Non Directional Beacon
Confirmatory sampling completed. No further action required. 2006-2007 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
N7076001
2000 GAF Crash Site (CRA13040)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
N7079001
Northern Fuel Cache Site Eon Lake
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 03 Initial Testing Program