Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 344 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000444
142 - Albany - 06258 - FORT ALBANY 67 - 3000106698 |
Initial testing completed. No further action required. | 2023-2024 | I Insufficient Information | 03 Initial Testing Program |
00000475
640 - Beecher Bay - 06787 - BECHER BAY INDIAN RESERVE NO. 1 - 0902100305 |
Remediation / risk management completed. No further action required. | 2008-2009 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000521
687 - Skeetchestn - 07169 - SKEETCHESTN - 0902171505 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00000630
202 - Thessalon - 06187 - THESSALON 12 - 3000048396 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00000850
Richibucto Head - Metal Impacts in Soil |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000870
Otter Head - South of the boathouse at reserve #1 (approx. 20 m south of the shoreline of Old Dave's Harbour) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000880
Otter Head - Landfill Area soils south of the Lighthouse on Reserve No. 2 and the former UHF antenna area |
Detailed testing completed. No further action required. | 2013-2014 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000933
15 Wing Landfill |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000941
Suffield Experimental Proving Ground (EPG) Project |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000949
CAM-4 SRR (Pelly Bay, Nunavut Territory)- Site Summit |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000989
Golf Course - landfill |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000994
Pesticide Container Landfill and Asphalt Dump |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00001000
Wood Hobby Club Site |
Confirmatory sampling completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001893
Battle Creek Community Pasture |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00002449
Operation's Building |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00006180
29 - We'koqma'q L’nue’kati - 06065 - WHYCOCOMAGH 2 - 1000028395 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006311
178 - Sheshegwaning - 06178 - SHESHEGWANING 20 - 3000050096 |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00006328
169 - Oneida Nation of the Thames - 06191 - ONEIDA 41 - 3000039096 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
00006330
134 - Wahta Mohawk - 06206 - WAHTA MOHAWK TERRITORY - 3000019095 |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00006341
550 - Musqueam - 08358 - MUSQUEAM 2 - 7000041994 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006348
560 - Kwikwetlem First Nation - 08009 - COQUITLAM NO. 1 - 7000046794 |
Long term monitoring completed. No further action required. | 2023-2024 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00006387
449 - Horse Lake First Nation - 06676 - HORSE LAKES 152B / 6000004494 |
Remediation / risk management completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006400
557 - Lil'wat Nation - 07996 - MOUNT CURRIE NO. 1 - 7000097797 |
Long term monitoring completed. No further action required. | 2008-2009 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00006432
232 - Wahnapitae - 06171 - WAHNAPITAE 11 - 3000034295 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00006435
220 - Nipissing First Nation - 06152 - NIPISSING 10 - 3000034395 |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00006478
166 - Chippewas of the Thames First Nation - 06188 - CHIPPEWA OF THE THAMES FIRST NATION INDIAN RESERVE - 3000113799 |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00006500
437 - Alexis Nakota Sioux Nation - 06649 - ALEXIS 133 - 6000021196 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006590
546 - Halfway River First Nation - 06956 - HALFWAY RIVER 168 - 7000071796 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006756
501 - Taku River Tlingit - 00181 - UNNAMED NO. 10 - 0802963206 |
Detailed testing completed. No further action required. | 2011-2012 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00006796
265 - Buffalo Point First Nation - 06366 - BUFFALO POINT 36 - 4000013395 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006812
610 - Kwadacha Nation - 07576 - FORT WARE 1 - 7000070996 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006834
3 - Elsipogtog First Nation - 06004 - RICHIBUCTO 15 - 0203122806 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006885
612 - Nadleh Whuten - 07472 - SEASPUNKUT 4 - 7000034694 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006886
660 - Tla-o-qui-aht First Nations - 06873 - OPITSAT 1 - 7000011394 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006922
565 - Matsqui First Nation - 08036 - MATSQUI MAIN 2 - 0903341007 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00006976
383 - Pasqua First Nation #79 - 06569 - PASQUA NO. 79 - 0603497308 |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007005
383 - Pasqua First Nation #79 - 06569 - PASQUA 79 / 0603521108 |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
00007696
561 - Douglas - 08011 - LELACHEN 6 - 0904491709 |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007745
390 - Fishing Lake First Nation - 06576 - FISHING LAKE INDIAN RESERVE NO. 89 - 0604557609 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007772
361 - Cowessess - 06543 - COWESSESS INDIAN RESERVE NO. 73 - 0604637609 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007773
361 - Cowessess - 06543 - COWESSESS INDIAN RESERVE NO. 73 - 0604637709 |
Initial testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007774
361 - Cowessess - 06543 - COWESSESS INDIAN RESERVE NO. 73 - 0604637809 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007775
361 - Cowessess - 06543 - COWESSESS INDIAN RESERVE NO. 73 - 0604637909 |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007857
630 - Mowachaht/Muchalaht - 07044 - AHAMINAQUUS 12 - 0904777710 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008073
277 - Poplar River First Nation - 06391 - POPLAR RIVER NO. 16 - 4000016595 |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008368
Groundwater-monitoring perimeter - DND RTA/Shannon limit |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008372
LAB-1, Cape Kakkiviak, SRR Site |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008387
Denison Armoury |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008433
YA-5 Yarrows B - Lot Parking and Roads |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008436
YA-4 Yarrows Former Shipyard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008458
YA-6 Yarrows Consolidatn Area Y-Gate |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008494
CAM-1A |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 05 Detailed Testing Program |
00008522
Willow Park (4328) - Armoury South Site |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00008526
Base POL - B401 Korea Rd |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008545
Road East of gate 9 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00008550
PIN-1BG Croker River |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008557
Beauceville armoury |
Remediation / risk management completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008569
TMFRC |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008572
Etobicoke Armoury |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00008606
DY-22 Dockyard IL Bldg 20 & 21 Former Paint/Oil Stores & UST |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008612
DY-28 Dockyard Signal Hill Bldg 506 - Fmr Oil & Paint Stores |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00008613
DY-29 Dockyard Signal Hill Bldg 504 Fmr Mechanic Repair Shop |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00008614
DY-30 Dockyard Signal Hill Bldg 516 - Former Garage |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008615
DY-31 Dockyard Signal Hill Fmr Fuelling Facility Canteen Rd |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008616
NAD-10 Naden South - East of Admirals |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008648
North Bay Former FFTA |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008650
COL-31 Colwood Bldg 65 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00008658
COL-39 Colwood Storage Supply Warehouse and Parking Lot |
Historical review completed. No further action required. | 2019-2020 | 02 Historical Review | |
00008659
COL-40 Colwood North Western Bank of Dunn's Nook |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008661
BAR-1, Komakuk Beach |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008662
BAR-3, Tuktoyaktuk |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008663
BAR-4, Nicholson Peninsula |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008667
FOX-2, Longstaff Bluff |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008674
LAB-6 |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008675
FOX-CA |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008678
CAM-A3A |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008680
PIN-DA |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008681
PIN-CB |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008682
PIN-2A |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008689
Rouyn-Noranda Armoury |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00008690
Rouyn-Noranda Armoury - parking and POL & Hazmat storage |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00011449
Resolute Bay (Caustic materials spill) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00011540
Sable Island - APEC 10 - Abandonned Landfill |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012246
Bon Portage Island Outer Island - no human health or ecological risk |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012320
Coldspring Head - Metal Impacts in Soil |
Confirmatory sampling completed. No further action required. | 2012-2013 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012797
PORT CREDIT (Harbour Marina Building) |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
00012798
PORT CREDIT (Maintenance shop) |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
00013140
Burgeo (SAR (New)) |
Long term monitoring completed. No further action required. | 2012-2013 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00013372
Cape George (Metal Impacts in Soil near Tower) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00016708
Haszard Point Range Front - Metals in soil |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00016812
Bergeman Point Range Rear - No Impacts |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017015
Moody Point Range Rear - No Impacts |
Initial testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017016
Mya Point - Lead Paint, Metals in soil within SSCs |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017057
Pointe Sapin Range Front - No Issues |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017220
Cape Sharp - No Action Required near Foundation/Transformers |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017635
Hawkes Point - No Metal/PCB Impacts in Soil |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017688
Lords Cove Office (No Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017716
ARISAIG (potential hydrocarbon/metals/PCB impacted Soil) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017724
BAY ST. LAWRENCE (Former dredge spoil area CLOSED) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017745
CHEBOGUE (TOWN POINT HILL) (No Impacted Soils- Dredge Spoil Disp. Area) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017751
CLARK'S HARBOUR ( No Impacted Soil/GW- Adjacent Properties CLOSED) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017755
CRIBBONS POINT - No Land Based Impacts Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017816
LITTLE HARBOUR (L'ARDOISE) (no impacts on soil Closed) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017826
LITTLE RIVER (VICTORIA COUNTY) (No Impacts to Soil-Dredge Spoils Disposal Area) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017851
METEGHAN (No Soil Impacts- Dredge Spoil Disp. Area) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017852
METEGHAN (No Soil/GW Impacts- Adj. Shipyard) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017858
MURPHYS POND -no soil impacts in dredge spoil area Closed |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017863
NEW HARBOUR (GUYSBOROUGH COUNTY) (Solid Waste Dumping - Slipway Area) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017868
NORTHPORT (no metals contamination Closed) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017873
OWLS HEAD (metals within SSC Closed) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017885
PORT BICKERTON EAST (no soil impacts Closed) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017886
PORT BICKERTON WEST (no onsite metal contamination Closed) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017975
GRAHAM POND - No Impacts Land Based Impacts Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017986
MILLIGANS SHORE - No Groundwater Impacts- Former UST |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017992
NAUFRAGE (No Land-Based Issues) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017997
NORTH LAKE (No Impacted Soil- Dredge Spoils/Creosote Timbers) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018000
RED HEAD - No Impacts- Dredge Spoil Disposal Area |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018006
SKINNERS POND (No Soil Impacts- Dredge Spoil Disp. Area) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018012
STANLEY BRIDGE (No Impacted Soils near Shoreline) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018038
CARAQUET (No Land Based Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018087
POINTE-SAPIN (No Impacted Soil- Various Sources) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00018532
Robin Hood Bay Transmitter (MF Tx / VHF) - Electrical Substation |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00018801
Glovertown (Wharf Light - Shed/wharf) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00019027
Boxey (Uplands - DFRP# 34579) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019415
Heatherton (SCH - DFRP# 11243 - Upland) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021064
Lower Puntledge Hatchery - Fuel Storage and Fillin |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00022046
CARLETON - FISHERIES SECTION, DFO/TC-SHARED WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022189
Bon Portage Island Outer Island - no impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022827
Garden River Landfill |
Initial testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022882
Chaudière Bridge |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00023018
Leo Creek Field Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023302
1145 Aylmer Street, Champlain Golf Club |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023310
Philippe Lake Former Landfill |
Initial testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023347
Laurier Street, East of Eddy |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00024012
Booth Street, West of LeBreton near Chaudiere Falls |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024013
Booth Street East, West of Wellington |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024014
Chaudiere Island Lot Pa |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024015
Chaudiere Island Lot P |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024052
Belza Farmhouse |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024057
Montreal Road Complex ON |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024292
Sandy Pond Day-Use Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024680
Walker Acquisition |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024835
Building M-210 Former UST |
Detailed testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024843
B101 - Electrical Mechanical Engineering |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024844
B163 - Fire Hall |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024859
17 Wing NW of Log Building 129 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024864
Dundurn Fire Hall |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024913
Shearwater Fire Hall Storage Shed (SH40) (Site 253) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024914
Shearwater CC-144B Challenger Crash Site (Site 249) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024918
Shearwater Aircraft Burn Area (Site 252) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024923
19 Wing Hangar 7 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024948
Kapyong Site |
Confirmatory sampling completed. No further action required. | 2023-2024 | 09 Confirmatory Sampling and Final Reporting | |
00024953
Roads and Grounds Storage Yard |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00024960
South RV Compound and P-151 Compound Area |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00024964
B126 Refinishing Shop |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00025004
MAT-6 Sewage Treatment Facility |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025005
MAT-7 Former Septic Field |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025016
8 Wing 10 Hangar |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025577
Canol Trail |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025803
Institute for Research in Construction, Carleton Place |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00025822
Jasper NP Abandoned Oil Tank |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025885
309 - Chemawawin Cree Nation - 06470 - CHEMAWAWIN 2 - MB04818211 |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00026098
Former Fire Training Area (PFAS) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026099
Former Fire Training Area (PFAS) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026104
Former fire training area (PFAS) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026114
Charlottetown Airport Fire Training Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026116
Moncton Airport Fire Training Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026119
Former Fire Training Area (PFAS) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00026120
Former Fire Training Area (PFAS) (Pre-1976) |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026523
436 - Piikani Nation - 06647 - PIIKANI - AB04875516 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00026628
128 - Naicatchewenin - 06243 - RAINY LAKE 17A - ON04883918 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026633
128 - Naicatchewenin - 06243 - RAINY LAKE 17A - ON04883718 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00027680
Saskatoon Airport - Former Fire Training Area (FFTA) - North |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027681
Saskatoon Airport - Former Fire Training Area (FFTA) - South |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027731
Fire Training Area (PFAS) |
Initial testing completed. No further action required. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027732
Former Fire Training Area (PFAS) (Post 1976) |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027735
Garage and Small Shed |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00028004
MMC |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00028061
Maple Creek Irrigation Project, Main Storage Yard |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00028066
Nashlyn Irrigation Project |
Historical review completed. No further action required. | 2022-2023 | 02 Historical Review | |
00028067
Consul Irrigation Project |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00028068
Consul Irrigation Project |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028070
Consul Irrigation Project |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028072
Consul Irrigation Project |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028073
Consul Irrigation Project |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028074
Consul Irrigation Project |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028075
Consul Irrigation Project |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028124
Rideau Falls Dam & Central Heating NRC (Plant Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00028138
North Waldeck |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00373001
Pleasantville 310 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373003
Pleasantville 530 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373005
Pleasantville 508 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373007
Pleasantville 512 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00723001
Port aux Basques Ferry Terminal |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00854001
Pinetree Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00854003
Pinetree Site - Area B |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00854004
Pinetree Site - Area C |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00854005
Pinetree Site - Area D |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00854007
Pinetree Site - Area F |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967023
Former USAF POL Underground Storage |
Historical review not required. | 2000-2001 | 01 Identify Suspect Sites | |
00967025
Former USAF POL Underground Storage |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967031
Former Powerhouse |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967034
Former Fuel Storage USTs |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967035
Former UST Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967043
Fuel Contaminated Site |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967054
Hanger 21 & 22 Abandoned USTs & ASTs |
Historical review not required. | 2000-2001 | 01 Identify Suspect Sites | |
00967062
Former Rail Siding Fuel Pipelines |
Historical review not required. | 2000-2001 | 01 Identify Suspect Sites | |
01822018
Canadian Side & Northside |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01822076
Main Base and Civil Aviation Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822086
Survival Tank Farm (STF 3000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01822094
Lower Tank Farm (LTF 2000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01981002
RED HEAD - Soil/GW Impacts- USTs/Fuel Dispenser |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02645001
Cross Island - Metal/Hydrocarbons/PAH in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02717086
Engine Test Cell |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717131
Hangar 9, Former Tank 33 |
Historical review completed. No further action required. | 2002-2003 | 02 Historical Review | |
02731002
The Atlantic Food and Horticulture Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02739001
Aldershot Landfill/Former Incinerator |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739007
Active 100m Range - Aldershot |
Initial testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 03 Initial Testing Program |
02739012
Meadowview Landfill - Aldershot |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02739013
Rocket Range |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
02739026
Former EME Vehicle Maintenance Garage and Sewer - Aldershot |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739053
Tent City Areas |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
02863003
CFB Shearwater (203) - Incinerator/Fill Site (DIPM Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
02863006
Shearwater (206) Former Barrel site HH (DIPM Site) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863008
CFB Shearwater (208) - Former Maintenance Hangar |
Long term monitoring completed. No further action required. | 2019-2020 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
02863010
Shearwater (210) - Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863023
Shearwater (223) - Building 4 and H (POL) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863024
Shearwater (224): Canex Garage (132), Former Firehall & UST |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02863030
Shearwater(230)-Bldg31,31A,31B,32(Mobl Spprt Maint) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863054
CFB Shearwater (205) - Ammunition Compound |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044007
DCD School (907) - Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03057015
Old Service Station (OSS) |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
03117001
Beaver Island- no human health or ecological risks (East End) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03640001
Parks Canada Trade Waste Site |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03640002
Former Town Landfill |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03983001
Southwest Head - Metals Impacts in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03988001
Swallowtail - Metal and Hydrocarbon Impacts in Soil |
Confirmatory sampling completed. No further action required. | 2012-2013 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04439002
CHOCKPISH (CÔTE-SAINTE-ANNE) (No Action Recommended) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
04514001
Point Escuminac - Lead Based Impacts |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05008002
539 - Nuxalk Nation - 07879 - BELLA COOLA 1 - 7000000893 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
05017006
559 - Sts'ailes - 08007 - CHEHALIS NO. 5 - 7000030894 |
Long term monitoring completed. No further action required. | 2008-2009 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
05020004
642 - Cowichan - 06799 - COWICHAN 1 - 7000019894 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05040001
627 - Gwawaenuk Tribe - 07025 - HOPETOWN 10A - 7000039994 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05042021
688 - Tk'emlúps te Secwépemc - 07173 - KAMLOOPS 1 - 7000070696 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05043001
563 - Katzie - 08024 - KATZIE NO. 1 - 7000012994 |
Long term monitoring completed. No further action required. | 2008-2009 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
05043002
563 - Katzie - 08024 - KATZIE NO. 1 - 7000013194 |
Long term monitoring completed. No further action required. | 2008-2009 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
05059001
565 - Matsqui - 08036 - MATSQUI MAIN 2 - 7000003693 |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05106002
593 - T'it'q'et - 08139 - TOWINOCK 2 - 7000005594 |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05121001
468 - Fort McMurray #468 First Nation - 06722 - GREGOIRE LAKE 176 / 6000000493 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
05123002
470 - Chipewyan Prairie First Nation - 06726 - JANVIER NO. 194 - 6000001793 |
Long term monitoring completed. No further action required. | 2002-2003 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
05130002
430 - Siksika Nation - 06636 - SIKSIKA 146 / 6000029397 |
Long term monitoring completed. No further action required. | 2012-2013 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
05136002
462 - Saddle Lake Cree Nation - 06703 - WHITE FISH LAKE 128 - 6000026696 |
Long term monitoring completed. No further action required. | 2016-2017 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
05137007
432 - Tsuut'ina Nation - 06639 - TSUU T'INA NATION 145 - 6000024296 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
05151001
141 - Beausoleil - 06199 - CHRISTIAN ISLAND 30 - 3000012894 |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05167001
200 - Mississauga - 06159 - MISSISSAGI RIVER 8 - 3000044596 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05338005
564 - Kwantlen First Nation - 08033 - LANGLEY 5 - 7000047995 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05340003
26 - Membertou - 06056 - MEMBERTOU 28B - 1000012493 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05347001
584 - Cheam - 08081 - CHEAM 1 / 7000056595 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05348002
591 - Cayoose Creek - 08117 - CAYOOSH CREEK 1 - 7000016894 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05362001
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000067896 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05381001
440 - Enoch Cree Nation #440 - 06652 - ENOCH CREE NATION 135 - 6000021796 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05613001
Mount Apica - north slope |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06294001
Adminstrative Area-Domaine, Lozeau and Bougainville Islands |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06651003
Demolition site, CEF Farnham |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06680004
Royal Military College, Former reservoir T20 (building 102) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06872002
Moras Island |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959005
Site 11.3 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06959007
Site 13.3 |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
06959037
Site 01.3 |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
07199001
Jean Canfield Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07221008
Used snow sites, ASU LP |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07525123
Isachsen High Arctic Weather Station |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
08708013
Gloucester Landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
10003001
Land |
Remediation / risk management completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
10855002
London Airport - Former Firefighting Training Areas |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10855007
Building south of the ATB - London Airport |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10885002
HMCS Prevost Armoury |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
11022039
Fire Fighting Training Area #1 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022045
Firehall #1 |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022152
Hangar 17 POL Compound |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11022154
Construction Waste Landfill #1; Closed |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022156
Engine Test Site; Former |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11080002
Strawberry Island - Dump Site |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11762002
Area B |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11919001
MAMAINSE HARBOUR (Old House of Ferroclad fishing) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
11943001
Thunder Bay International Airport - Former Firefighting Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
12746002
511-C03 Stony Mountain - Dangerous goods storage area |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 05 Detailed Testing Program |
13201002
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
13252001
Fire Training Area |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13252002
'Q' Area Fuel Storage Tanks |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
13440001
West Poplar Border Crossing - Septic |
Confirmatory sampling completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13663008
Regina Research Farm |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13663009
Regina Research Farm |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
13820001
15 Wing B58 & EME Shop Test Site 2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15369003
Lacombe Research Centre |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
15404038
Parks Canada Operations Compound |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15529018
Cardiff Transmitter Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15531016
Building 206 and 208 |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15684001
4 AES Runway Training Pad / ATCO Pipeline |
Detailed testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
15684012
Building 170 |
Initial testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15684031
Landfill Site 7 |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16373005
Pacific Agri-Food Research Centre |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
16506001
Slesse Demolition Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17403003
DY-4 Dockyard FMF Consolidation |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17410006
Esquimalt Graving Dock Uplands AEC's 13,20 |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451003
COL-13 Colwood Fleet Diving Unit |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451013
COL 4 Colwood Fire Fighting Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17966001
Seal Bay Transmitter Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17970003
Refuelling Vehicle Compound near B-100 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18638001
Government of Canada Building - Kelowna |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18976001
Power Plant at Det Holberg |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146006
Former PCBs Storage Area - APEC 36 |
Detailed testing completed. No further action required. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
20247042
Sewage Outfall |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
20625001
Former Sambault garabage dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
30918002
Confederation Heights Insurance Building |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38314001
GBU3 Oily Waste |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54118001
Burlington Lift Bridge (Parcel B) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
55793005
Southside hazardous waste storage facility area (SSS7). |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
55793006
Southside Landfill # 1 (SLF1) |
Long term monitoring completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
55793014
Area Close to Road near Pond. (ACRP) |
Confirmatory sampling completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
55793016
Arena Site (NOAS) |
Long term monitoring completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
55793017
Adjacent to transformer building 600.(Bldg 24/600) |
Long term monitoring completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
55793020
Temporary hydrocarbon contaminated soil containment facility. (Soil Berm) |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
55870001
White Hills |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
67598002
Rainy River Border Crossing |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
81103001
Malpeque Outer Range Front (Metals Impacts) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
81209001
Wood Islands Light (Metals in Soil) |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1001001
CAM C - MATHESON POINT |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1003001
CAM E - KEITH BAY |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1018001
FOX 1 - ROWLEY ISLAND |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
C1020001
FOX B - NADLUARDJUK LAKE |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
C1021001
FOX D - KIVITOO |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1039001
Bear Island (James Bay) |
Confirmatory sampling completed. No further action required. | 2014-2015 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1040001
PIN D - Ross Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1041001
CAM A - STURT POINT |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1042001
CAM B - HAT ISLAND |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
C1044001
PIN C - BERNARD HARBOUR |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
C1045001
PIN-E Cape Peel |
Long term monitoring completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
C1050001
PIN B - CLIFTON POINT |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1057001
Kittigazuit Bay |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0010002
Fire Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N7081001
BAR-E SRR (Horton River) - Site Summit |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N7093001
CF-18 Crash Site - A/C 188745 (Aug. 05) |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
- Version:
- 40